ScotRail at Crianlarich
How this operator is doing here
ScotRail had 6,179 scheduled stops at Crianlarich in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 60.4% of recorded arrivals came within three minutes and 0.9% of stops were cancelled.
ScotRail trains at Crianlarich also serve Upper Tyndrum (7.2 km north-west, 68.4% on time, 0.6% cancelled), Tyndrum Lower (7.6 km north-west, 63.4% on time, 1.1% cancelled), Ardlui (11.7 km south-west, 60.9% on time, 0.8% cancelled), Bridge of Orchy (16.6 km north-west, 67.6% on time, 0.6% cancelled), Arrochar and Tarbet (21.8 km south, 55.7% on time, 0.8% cancelled) and Dalmally (22.4 km west, 78.2% on time, 1.4% cancelled), which are the stations on its network closest to Crianlarich.
Within 30 km of here, ScotRail runs best at Dalmally, 22.4 km west (78.2%), and worst at Arrochar and Tarbet, 21.8 km south (55.7%).
The busiest ScotRail station within 30 km of Crianlarich is Dalmally, 22.4 km west, with about 13 scheduled stops a day.
Of the 1 operators with enough records at Crianlarich, ScotRail is the most punctual, at 60.4%.
Over three full railway years ScotRail at Crianlarich has improved each time, from 45.8% within three minutes in 2023-24 to 57.1% in 2024-25 and 59.2% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 478 | 60.9% | 0.0% |
| Period 6 of 2026-27 | 480 | 65.7% | 1.0% |
| Period 5 of 2026-27 | 480 | 65.2% | 0.4% |
| Period 4 of 2026-27 | 478 | 54.4% | 0.8% |
| Period 3 of 2026-27 | 480 | 54.7% | 0.6% |
| Period 2 of 2026-27 | 480 | 51.9% | 0.0% |
| Period 1 of 2026-27 | 549 | 66.7% | 0.0% |
| Period 13 of 2025-26 | 527 | 61.8% | 0.8% |
| Period 12 of 2025-26 | 472 | 66.2% | 0.2% |
| Period 11 of 2025-26 | 466 | 56.0% | 1.5% |
| Period 10 of 2025-26 | 398 | 68.6% | 3.3% |
| Period 9 of 2025-26 | 426 | 52.4% | 2.3% |
| Period 8 of 2025-26 | 465 | 59.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Crianlarich
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 281 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out