Carstairs
CRSScotlandManaged by ScotRail
How this station is performing
Carstairs had 6,793 scheduled stops to Period 7 of 2026-27, about 19 a day. 82.6% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Carstairs opened on 15 February 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Carstairs is the oldest; the next oldest, Carluke, dates from 1848.
The nearest stations to Carstairs are Lanark (6.8 km west), Carluke (12.1 km west), Fauldhouse (14.9 km north), Breich (15.1 km north) and Shotts (16.3 km north-west). 1 stations lie within 10 km in all. At 82.6%, Carstairs is less punctual than all of them; the best of the five, Breich, manages 90.9%.
Carstairs takes its name from a Village called Carstairs, home to about 880 people, and the station stands 1.5 km from its centre.
3 operators call at Carstairs: ScotRail (84.5%, 84% of stops), Caledonian Sleeper (–, 9% of stops) and TransPennine Express (82.3%, 7% of stops). They are close together, with ScotRail leading on 84.5% and TransPennine Express trailing on 82.3%, a gap of 2.2 percentage points.
Compared with 3 stations of a similar size in Scotland, Carstairs is the most punctual, at 82.6%. The comparison group includes Crianlarich (60.4%), Reston (76.9%) and Keith (75.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 5,699 | 84.5% | 1.3% |
| Caledonian Sleeper | 607 | – | – |
| TransPennine Express | 487 | 82.3% | 0.0% |
Operators with their own page for this station are linked to it.
Late train at Carstairs? Delay Repay
These operators call at Carstairs and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 530 | 79.7% | 0.8% |
| Period 6 of 2026-27 | 535 | 86.0% | 1.5% |
| Period 5 of 2026-27 | 536 | 81.8% | 1.5% |
| Period 4 of 2026-27 | 529 | 82.0% | 1.9% |
| Period 3 of 2026-27 | 536 | 86.5% | 1.7% |
| Period 2 of 2026-27 | 501 | 83.4% | 1.6% |
| Period 1 of 2026-27 | 618 | 83.9% | 1.1% |
| Period 13 of 2025-26 | 370 | 83.7% | 2.4% |
| Period 12 of 2025-26 | 536 | 87.4% | 2.1% |
| Period 11 of 2025-26 | 577 | 84.6% | 0.7% |
| Period 10 of 2025-26 | 454 | 79.3% | 2.0% |
| Period 9 of 2025-26 | 536 | 78.4% | 2.6% |
| Period 8 of 2025-26 | 535 | 76.4% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crianlarich | 6,460 | 60.4% | 0.9% |
| Reston | 6,337 | 76.9% | 1.6% |
| Keith | 7,389 | 75.0% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out