Barnstaple
BNPSouth WestManaged by Great Western Railway
How this station is performing
Barnstaple had 10,966 scheduled stops to Period 7 of 2026-27, about 30 a day. 80.4% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Barnstaple opened on 1 August 1854, 172 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barnstaple is the oldest; the next oldest, Umberleigh, dates from 1854.
The nearest stations to Barnstaple are Chapelton (Devon) (6.9 km south-east), Umberleigh (10.2 km south-east), Portsmouth Arms (15.1 km south-east), Kings Nympton (18.9 km south-east) and Eggesford (24.5 km south-east). 1 stations lie within 10 km in all. Of the five, Eggesford is the most punctual at 81.1% and Kings Nympton the least at 69.8%, with Barnstaple on 80.4%.
Barnstaple takes its name from a town called Barnstaple, home to about 24,094 people, and the station stands 1.4 km from its centre.
For Barnstaple, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 70.1% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2023-24, at 93.9%, which is 23.8 percentage points higher. Cancellations peaked at 12.5% of scheduled stops in Period 9 of 2024-25, against 4.2% over the latest 13 periods.
1 of 3 stations of a similar size in South West are more punctual than Barnstaple on 80.4%. The comparison group includes Crewkerne (60.8%), Eggesford (81.1%) and Umberleigh (74.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 10,966 | 80.4% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Barnstaple? Delay Repay
These operators call at Barnstaple and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 922 | 79.5% | 4.3% |
| Period 6 of 2026-27 | 922 | 72.4% | 1.1% |
| Period 5 of 2026-27 | 928 | 78.5% | 3.7% |
| Period 4 of 2026-27 | 922 | 84.5% | 4.3% |
| Period 3 of 2026-27 | 922 | 84.4% | 4.6% |
| Period 2 of 2026-27 | 928 | 80.4% | 5.0% |
| Period 1 of 2026-27 | 1,060 | 85.8% | 0.8% |
| Period 13 of 2025-26 | 722 | 90.0% | 0.6% |
| Period 12 of 2025-26 | 302 | 89.9% | 1.7% |
| Period 11 of 2025-26 | 786 | 82.9% | 9.2% |
| Period 10 of 2025-26 | 842 | 81.6% | 1.1% |
| Period 9 of 2025-26 | 788 | 70.6% | 12.4% |
| Period 8 of 2025-26 | 922 | 70.1% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crewkerne | 10,966 | 60.8% | 1.9% |
| Eggesford | 10,964 | 81.1% | 3.9% |
| Umberleigh | 10,888 | 74.9% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out