Umberleigh
UMBSouth WestManaged by Great Western Railway
How this station is performing
Umberleigh had 10,888 scheduled stops to Period 7 of 2026-27, about 30 a day. 74.9% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Umberleigh opened on 1 August 1854, 172 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Umberleigh is the oldest; the next oldest, Kings Nympton, dates from 1854.
The nearest stations to Umberleigh are Chapelton (Devon) (3.7 km north-west), Portsmouth Arms (4.9 km south-east), Kings Nympton (8.6 km south-east), Barnstaple (10.2 km north-west) and Eggesford (14.2 km south-east). 3 stations lie within 10 km in all. Of the five, Eggesford is the most punctual at 81.1% and Kings Nympton the least at 69.8%, with Umberleigh on 74.9%.
Umberleigh takes its name from a Village called Umberleigh, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Umberleigh was Period 8 of 2023-24, at 63.7%, some time before the latest year. The strongest was Period 12 of 2023-24, at 90.2%, and the two are 26.5 percentage points apart. Cancellations peaked at 12.4% of scheduled stops in Period 9 of 2024-25, against 4.2% over the latest 13 periods.
2 of 3 stations of a similar size in South West are more punctual than Umberleigh on 74.9%. The comparison group includes Eggesford (81.1%), Barnstaple (80.4%) and Crewkerne (60.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 10,888 | 74.9% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Umberleigh? Delay Repay
These operators call at Umberleigh and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 914 | 74.6% | 4.4% |
| Period 6 of 2026-27 | 918 | 64.1% | 1.1% |
| Period 5 of 2026-27 | 924 | 71.9% | 3.6% |
| Period 4 of 2026-27 | 917 | 81.8% | 4.4% |
| Period 3 of 2026-27 | 918 | 76.8% | 4.6% |
| Period 2 of 2026-27 | 922 | 72.9% | 4.7% |
| Period 1 of 2026-27 | 1,051 | 81.0% | 0.8% |
| Period 13 of 2025-26 | 716 | 87.3% | 0.6% |
| Period 12 of 2025-26 | 299 | 85.4% | 1.7% |
| Period 11 of 2025-26 | 779 | 78.6% | 9.1% |
| Period 10 of 2025-26 | 835 | 74.9% | 1.1% |
| Period 9 of 2025-26 | 781 | 67.0% | 12.3% |
| Period 8 of 2025-26 | 914 | 65.7% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eggesford | 10,964 | 81.1% | 3.9% |
| Barnstaple | 10,966 | 80.4% | 4.2% |
| Crewkerne | 10,966 | 60.8% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out