Eggesford
EGGSouth WestManaged by Great Western Railway
How this station is performing
Eggesford had 10,964 scheduled stops to Period 7 of 2026-27, about 30 a day. 81.1% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Eggesford opened on 1 August 1854, 172 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Eggesford is the oldest; the next oldest, Kings Nympton, dates from 1854.
The nearest stations to Eggesford are Lapford (5.7 km south-east), Kings Nympton (5.8 km north), Morchard Road (9.3 km south-east), Portsmouth Arms (9.4 km north-west) and Copplestone (11.9 km south-east). 4 stations lie within 10 km in all. At 81.1%, Eggesford is more punctual than every one of them; the best of the five, Kings Nympton, manages 69.8%.
Eggesford takes its name from a Village called Eggesford, home to about 143 people, and the station stands 0.3 km from its centre.
For Eggesford, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 68.9% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2023-24, at 94.1%, which is 25.2 percentage points higher. Cancellations peaked at 12.5% of scheduled stops in Period 9 of 2024-25, against 3.9% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Eggesford is the most punctual, at 81.1%. The comparison group includes Barnstaple (80.4%), Crewkerne (60.8%) and Umberleigh (74.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 10,964 | 81.1% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Eggesford? Delay Repay
These operators call at Eggesford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 922 | 80.8% | 3.1% |
| Period 6 of 2026-27 | 922 | 75.9% | 1.1% |
| Period 5 of 2026-27 | 927 | 79.7% | 2.7% |
| Period 4 of 2026-27 | 921 | 82.5% | 4.3% |
| Period 3 of 2026-27 | 922 | 83.5% | 4.6% |
| Period 2 of 2026-27 | 928 | 81.8% | 4.6% |
| Period 1 of 2026-27 | 1,060 | 88.2% | 0.8% |
| Period 13 of 2025-26 | 722 | 93.3% | 0.6% |
| Period 12 of 2025-26 | 302 | 89.9% | 1.7% |
| Period 11 of 2025-26 | 786 | 82.2% | 9.2% |
| Period 10 of 2025-26 | 842 | 81.3% | 1.1% |
| Period 9 of 2025-26 | 788 | 71.6% | 12.3% |
| Period 8 of 2025-26 | 922 | 68.9% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnstaple | 10,966 | 80.4% | 4.2% |
| Crewkerne | 10,966 | 60.8% | 1.9% |
| Umberleigh | 10,888 | 74.9% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out