CrossCountry at Chesterfield
All trains at ChesterfieldCrossCountry across BritainEast Midlands
How this operator is doing here
CrossCountry had 11,982 scheduled stops at Chesterfield in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 54.2% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
CrossCountry trains at Chesterfield also serve Sheffield (15.8 km north, 51.7% on time, 3.4% cancelled), Derby (35.9 km south, 65.0% on time, 5.4% cancelled), Spondon (36.2 km south, 83.7% on time, 5.3% cancelled), Doncaster (36.6 km north-east, 57.1% on time, 5.7% cancelled), Nottingham (37.2 km south-east, 79.7% on time, 8.1% cancelled) and Beeston (38.1 km south, 75.5% on time, 7.3% cancelled), which are the stations on its network closest to Chesterfield.
The busiest CrossCountry station within 30 km of Chesterfield is Sheffield, 15.8 km north, with about 46 scheduled stops a day.
Of the 3 operators with enough records at Chesterfield, CrossCountry is the least punctual, at 54.2%.
For CrossCountry, Chesterfield is the 93rd best of 99 ranked stations. Its 54.2% here is 9.0 percentage points below the 63.2% across the whole network.
CrossCountry at Chesterfield has slipped sharply. 54.2% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 59.6% recorded in the 13 before. Cancellations held steady at 2.6% of scheduled stops, against 2.4% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 924 | 53.5% | 3.0% |
| Period 6 of 2026-27 | 921 | 49.5% | 5.9% |
| Period 5 of 2026-27 | 924 | 49.3% | 2.1% |
| Period 4 of 2026-27 | 924 | 48.6% | 3.1% |
| Period 3 of 2026-27 | 905 | 48.5% | 2.9% |
| Period 2 of 2026-27 | 922 | 44.6% | 1.8% |
| Period 1 of 2026-27 | 1,063 | 60.1% | 1.1% |
| Period 13 of 2025-26 | 969 | 57.5% | 1.5% |
| Period 12 of 2025-26 | 848 | 62.8% | 1.8% |
| Period 11 of 2025-26 | 929 | 71.8% | 2.2% |
| Period 10 of 2025-26 | 843 | 57.2% | 4.4% |
| Period 9 of 2025-26 | 922 | 46.5% | 2.9% |
| Period 8 of 2025-26 | 888 | 54.5% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chesterfield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 35,468 | 61.3% | 4.3% |
| Northern | 12,853 | 79.1% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out