Northern at Chesterfield
All trains at ChesterfieldNorthern across BritainEast Midlands
How this operator is doing here
Northern had 12,853 scheduled stops at Chesterfield in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 79.1% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Northern trains at Chesterfield also serve Dronfield (7.7 km north-west, 77.1% on time, 1.7% cancelled), Dore and Totley (11.8 km north-west, 72.2% on time, 2.0% cancelled), Woodhouse (14.6 km north, 81.8% on time, 2.0% cancelled), Kiveton Bridge (15.3 km north-east, 83.9% on time, 2.0% cancelled), Alfreton (15.6 km south, 78.1% on time, 2.1% cancelled) and Grindleford (15.6 km north-west, 71.8% on time, 2.0% cancelled), which are the stations on its network closest to Chesterfield.
Within 30 km of here, Northern runs best at Kiveton Bridge, 15.3 km north-east (83.9%), and worst at Bamford, 21.1 km north-west (68.2%).
The busiest Northern station within 30 km of Chesterfield is Sheffield, 15.8 km north, with about 320 scheduled stops a day.
Of the 3 operators with enough records at Chesterfield, Northern is the most punctual, at 79.1%.
Northern at Chesterfield has slipped a little, from 81.8% within three minutes in the previous 13 periods to 79.1% in the latest 13, a fall of 2.7 percentage points. Cancellations fell to 1.9% of scheduled stops from 3.4%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 996 | 83.0% | 1.3% |
| Period 6 of 2026-27 | 969 | 80.2% | 1.1% |
| Period 5 of 2026-27 | 834 | 79.3% | 1.0% |
| Period 4 of 2026-27 | 998 | 78.7% | 3.2% |
| Period 3 of 2026-27 | 999 | 74.4% | 2.7% |
| Period 2 of 2026-27 | 996 | 74.8% | 2.4% |
| Period 1 of 2026-27 | 1,144 | 82.7% | 1.2% |
| Period 13 of 2025-26 | 1,033 | 79.7% | 2.0% |
| Period 12 of 2025-26 | 995 | 81.3% | 1.1% |
| Period 11 of 2025-26 | 995 | 84.5% | 1.3% |
| Period 10 of 2025-26 | 902 | 77.8% | 1.6% |
| Period 9 of 2025-26 | 996 | 70.4% | 3.2% |
| Period 8 of 2025-26 | 996 | 80.3% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chesterfield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 35,468 | 61.3% | 4.3% |
| CrossCountry | 11,982 | 54.2% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out