Merseyrail at Chester
How this operator is doing here
Merseyrail had 40,993 scheduled stops at Chester in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 90.7% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
Merseyrail trains at Chester also serve Bache (1.5 km north-west, 87.6% on time, 2.9% cancelled), Capenhurst (8.2 km north-west, 87.2% on time, 2.6% cancelled), Ellesmere Port (9.5 km north, 93.9% on time, 1.7% cancelled), Overpool (10.2 km north, 97.9% on time, 1.8% cancelled), Little Sutton (10.7 km north-west, 83.2% on time, 1.8% cancelled) and Hooton (12.8 km north-west, 87.8% on time, 2.2% cancelled), which are the stations on its network closest to Chester.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 28.6 km north-west (99.3%), and worst at Leasowe, 27.6 km north-west (72.4%).
The busiest Merseyrail station within 30 km of Chester is Liverpool Central, 24.0 km north, with about 582 scheduled stops a day.
Of the 4 operators with enough records at Chester, Merseyrail is the most punctual, at 90.7%.
Merseyrail at Chester has edged up: 90.7% of stops came within three minutes of the timetable in the latest 13 periods, 3.2 percentage points better than the 87.5% of the 13 before. Cancellations held steady at 2.7% of scheduled stops, against 2.5% before.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,208 | 96.2% | 1.2% |
| Period 6 of 2026-27 | 3,101 | 88.7% | 3.9% |
| Period 5 of 2026-27 | 3,103 | 88.9% | 2.2% |
| Period 4 of 2026-27 | 3,107 | 83.1% | 2.6% |
| Period 3 of 2026-27 | 3,101 | 90.3% | 3.2% |
| Period 2 of 2026-27 | 3,101 | 91.6% | 2.7% |
| Period 1 of 2026-27 | 3,573 | 90.1% | 1.1% |
| Period 13 of 2025-26 | 3,405 | 89.4% | 1.4% |
| Period 12 of 2025-26 | 3,102 | 85.8% | 3.4% |
| Period 11 of 2025-26 | 3,100 | 87.7% | 6.5% |
| Period 10 of 2025-26 | 2,837 | 96.0% | 1.6% |
| Period 9 of 2025-26 | 3,159 | 95.0% | 2.0% |
| Period 8 of 2025-26 | 3,096 | 96.4% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 59,288 | 82.8% | 1.9% |
| Northern | 22,601 | 75.4% | 3.7% |
| Avanti | 9,605 | 65.3% | 6.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out