Northern at Chester
How this operator is doing here
Northern had 22,601 scheduled stops at Chester in the 13 periods to Period 7 of 2026-27, 17% of the station's total. 75.4% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Northern trains at Chester also serve Ellesmere Port (9.5 km north, 93.6% on time, 11.0% cancelled), Ince and Elton (Cheshire) (9.9 km north-east, 93.6% on time, 11.0% cancelled), Mouldsworth (10.6 km east, 79.7% on time, 2.6% cancelled), Helsby (11.3 km north-east, 75.1% on time, 7.6% cancelled), Delamere (14.7 km east, 87.0% on time, 2.5% cancelled) and Frodsham (15.2 km north-east, 67.5% on time, 5.6% cancelled), which are the stations on its network closest to Chester.
Within 30 km of here, Northern runs best at Thatto Heath, 27.8 km north (90.7%), and worst at Warrington West, 27.2 km north-east (66.5%).
The busiest Northern station within 30 km of Chester is Liverpool Lime Street, 24.3 km north, with about 193 scheduled stops a day.
Northern ranks 3rd of the 4 operators with enough records at Chester, on 75.4%.
For Northern, Chester is the 357th best of 493 ranked stations. Its 75.4% here is 3.2 percentage points below the 78.6% across the whole network.
Over three full railway years Northern at Chester has got worse each time, from 80.0% within three minutes in 2023-24 to 77.4% in 2024-25 and 77.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,755 | 71.2% | 3.0% |
| Period 6 of 2026-27 | 1,764 | 73.1% | 2.9% |
| Period 5 of 2026-27 | 1,582 | 76.3% | 3.5% |
| Period 4 of 2026-27 | 1,589 | 75.4% | 4.0% |
| Period 3 of 2026-27 | 1,760 | 74.6% | 2.6% |
| Period 2 of 2026-27 | 1,752 | 77.3% | 3.1% |
| Period 1 of 2026-27 | 2,034 | 80.2% | 3.0% |
| Period 13 of 2025-26 | 1,883 | 82.4% | 2.1% |
| Period 12 of 2025-26 | 1,612 | 81.0% | 2.2% |
| Period 11 of 2025-26 | 1,756 | 76.0% | 3.7% |
| Period 10 of 2025-26 | 1,604 | 70.4% | 6.4% |
| Period 9 of 2025-26 | 1,754 | 67.6% | 7.7% |
| Period 8 of 2025-26 | 1,756 | 72.5% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 59,288 | 82.8% | 1.9% |
| Merseyrail | 40,993 | 90.7% | 2.7% |
| Avanti | 9,605 | 65.3% | 6.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out