Chester
CTRNorth WestManaged by TfW Rail
How this station is performing
Chester had 132,487 scheduled stops to Period 7 of 2026-27, about 364 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Chester opened on 1 August 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chester is the oldest; the next oldest, Ellesmere Port, dates from 1863.
The nearest stations to Chester are Bache (1.5 km north-west), Capenhurst (8.2 km north-west), Stanlow and Thornton (9.4 km north), Ellesmere Port (9.5 km north) and Ince and Elton (Cheshire) (9.9 km north-east). 5 stations lie within 10 km in all. At 82.8%, Chester is less punctual than all of them; the best of the five, Ellesmere Port, manages 93.8%.
Chester is one of 3 stations named after a city called Chester, home to about 87,507 people; this one stands 0.4 km from its centre.
4 operators call at Chester: Transport for Wales (82.8%, 45% of stops), Merseyrail (90.7%, 31% of stops), Northern (75.4%, 17% of stops) and Avanti (65.3%, 7% of stops). The operator you travel with matters: Merseyrail reaches 90.7% within three minutes while Avanti manages 65.3%, a gap of 25.4 percentage points.
Compared with 3 stations of a similar size in North West, Chester is the most punctual, at 82.8%. The comparison group includes Preston (Lancs) (72.8%), Manchester Victoria (72.4%) and Manchester Oxford Road (55.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 59,288 | 82.8% | 1.9% |
| Merseyrail | 40,993 | 90.7% | 2.7% |
| Northern | 22,601 | 75.4% | 3.7% |
| Avanti | 9,605 | 65.3% | 6.9% |
Operators with their own page for this station are linked to it.
Late train at Chester? Delay Repay
These operators call at Chester and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,039 | 83.3% | 1.4% |
| Period 6 of 2026-27 | 10,003 | 77.8% | 3.4% |
| Period 5 of 2026-27 | 9,532 | 79.3% | 3.2% |
| Period 4 of 2026-27 | 9,693 | 78.6% | 4.5% |
| Period 3 of 2026-27 | 9,870 | 81.6% | 2.7% |
| Period 2 of 2026-27 | 10,232 | 82.5% | 2.9% |
| Period 1 of 2026-27 | 11,947 | 85.9% | 1.8% |
| Period 13 of 2025-26 | 11,543 | 87.0% | 1.4% |
| Period 12 of 2025-26 | 10,374 | 85.2% | 2.4% |
| Period 11 of 2025-26 | 10,305 | 83.9% | 4.1% |
| Period 10 of 2025-26 | 9,398 | 85.5% | 3.0% |
| Period 9 of 2025-26 | 9,763 | 79.9% | 3.4% |
| Period 8 of 2025-26 | 9,788 | 83.5% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Preston (Lancs) | 133,423 | 72.8% | 3.6% |
| Manchester Victoria | 135,103 | 72.4% | 2.9% |
| Manchester Oxford Road | 129,080 | 55.5% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out