Avanti had 9,605 scheduled stops at Chester in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 65.3% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.
Avanti trains at Chester also serve Flint (17.8 km west, 67.5% on time, 2.9% cancelled), Liverpool South Parkway (17.9 km north, 66.0% on time, 6.9% cancelled), Wrexham General (18.2 km south-west, 70.8% on time, 9.8% cancelled), Runcorn (18.4 km north-east, 67.9% on time, 6.0% cancelled), Hartford (Cheshire) (22.3 km east, – on time, – cancelled) and Liverpool Lime Street (24.3 km north, 64.9% on time, 5.8% cancelled), which are the stations on its network closest to Chester.
Within 30 km of here, Avanti runs best at Runcorn, 18.4 km north-east (67.9%), and worst at Warrington Bank Quay, 27.9 km north-east (45.4%).
The busiest Avanti station within 30 km of Chester is Warrington Bank Quay, 27.9 km north-east, with about 61 scheduled stops a day.
Avanti at Chester improved sharply over the past year. In the latest 13 periods 65.3% of stops came within three minutes of the timetable, up 6.5 percentage points from 58.8% in the 13 before. Cancellations held steady at 6.9% of scheduled stops, against 7.1% before.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 724 | 69.9% | 1.9% |
| Period 6 of 2026-27 | 756 | 55.6% | 4.1% |
| Period 5 of 2026-27 | 765 | 59.3% | 13.3% |
| Period 4 of 2026-27 | 719 | 62.4% | 18.2% |
| Period 3 of 2026-27 | 752 | 66.3% | 3.9% |
| Period 2 of 2026-27 | 733 | 63.3% | 8.5% |
| Period 1 of 2026-27 | 763 | 74.2% | 4.1% |
| Period 13 of 2025-26 | 832 | 74.5% | 2.9% |
| Period 12 of 2025-26 | 763 | 72.3% | 3.9% |
| Period 11 of 2025-26 | 690 | 70.7% | 5.9% |
| Period 10 of 2025-26 | 588 | 69.0% | 8.8% |
| Period 9 of 2025-26 | 744 | 52.0% | 8.7% |
| Period 8 of 2025-26 | 776 | 58.3% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 59,288 | 82.8% | 1.9% |
| Merseyrail | 40,993 | 90.7% | 2.7% |
| Northern | 22,601 | 75.4% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out