Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Avanti at Chester

All trains at ChesterAvanti across BritainNorth West

On time, last 13 periods65.3%Whole station: 82.8%
Cancelled6.9%Whole station: 2.8%
Scheduled stops9,605Of 132,487 at the station

How this operator is doing here

Avanti had 9,605 scheduled stops at Chester in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 65.3% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.

Avanti trains at Chester also serve Flint (17.8 km west, 67.5% on time, 2.9% cancelled), Liverpool South Parkway (17.9 km north, 66.0% on time, 6.9% cancelled), Wrexham General (18.2 km south-west, 70.8% on time, 9.8% cancelled), Runcorn (18.4 km north-east, 67.9% on time, 6.0% cancelled), Hartford (Cheshire) (22.3 km east, – on time, – cancelled) and Liverpool Lime Street (24.3 km north, 64.9% on time, 5.8% cancelled), which are the stations on its network closest to Chester.

Within 30 km of here, Avanti runs best at Runcorn, 18.4 km north-east (67.9%), and worst at Warrington Bank Quay, 27.9 km north-east (45.4%).

The busiest Avanti station within 30 km of Chester is Warrington Bank Quay, 27.9 km north-east, with about 61 scheduled stops a day.

Avanti at Chester improved sharply over the past year. In the latest 13 periods 65.3% of stops came within three minutes of the timetable, up 6.5 percentage points from 58.8% in the 13 before. Cancellations held steady at 6.9% of scheduled stops, against 7.1% before.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 77.0%Period 2 of 2023-24: 71.6%Period 3 of 2023-24: 65.5%Period 4 of 2023-24: 75.8%Period 5 of 2023-24: 70.8%Period 6 of 2023-24: 77.9%Period 7 of 2023-24: 64.9%Period 8 of 2023-24: 65.7%Period 9 of 2023-24: 64.0%Period 10 of 2023-24: 70.9%Period 11 of 2023-24: 74.8%Period 12 of 2023-24: 70.9%Period 13 of 2023-24: 74.4%Period 1 of 2024-25: 72.6%Period 2 of 2024-25: 70.0%Period 3 of 2024-25: 56.3%Period 4 of 2024-25: 54.4%Period 5 of 2024-25: 54.1%Period 6 of 2024-25: 59.4%Period 7 of 2024-25: 63.1%Period 8 of 2024-25: 57.3%Period 9 of 2024-25: 49.5%Period 10 of 2024-25: 47.2%Period 11 of 2024-25: 51.4%Period 12 of 2024-25: 63.1%Period 13 of 2024-25: 66.7%Period 1 of 2025-26: 60.8%Period 2 of 2025-26: 52.7%Period 3 of 2025-26: 62.3%Period 4 of 2025-26: 59.9%Period 5 of 2025-26: 58.8%Period 6 of 2025-26: 64.2%Period 7 of 2025-26: 61.6%Period 8 of 2025-26: 58.3%Period 9 of 2025-26: 52.0%Period 10 of 2025-26: 69.0%Period 11 of 2025-26: 70.7%Period 12 of 2025-26: 72.3%Period 13 of 2025-26: 74.5%Period 1 of 2026-27: 74.2%Period 2 of 2026-27: 63.3%Period 3 of 2026-27: 66.3%Period 4 of 2026-27: 62.4%Period 5 of 2026-27: 59.3%Period 6 of 2026-27: 55.6%Period 7 of 2026-27: 69.9%
This pageGreat Britain
0%10%20%30%Period 1 of 2023-24: 4.3%Period 2 of 2023-24: 1.9%Period 3 of 2023-24: 8.3%Period 4 of 2023-24: 2.8%Period 5 of 2023-24: 3.9%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 6.2%Period 8 of 2023-24: 20.9%Period 9 of 2023-24: 17.7%Period 10 of 2023-24: 20.5%Period 11 of 2023-24: 9.3%Period 12 of 2023-24: 16.5%Period 13 of 2023-24: 21.5%Period 1 of 2024-25: 13.5%Period 2 of 2024-25: 11.7%Period 3 of 2024-25: 24.7%Period 4 of 2024-25: 15.7%Period 5 of 2024-25: 19.5%Period 6 of 2024-25: 6.0%Period 7 of 2024-25: 8.3%Period 8 of 2024-25: 9.8%Period 9 of 2024-25: 12.8%Period 10 of 2024-25: 19.2%Period 11 of 2024-25: 12.9%Period 12 of 2024-25: 4.7%Period 13 of 2024-25: 3.8%Period 1 of 2025-26: 3.9%Period 2 of 2025-26: 6.1%Period 3 of 2025-26: 6.2%Period 4 of 2025-26: 5.1%Period 5 of 2025-26: 5.0%Period 6 of 2025-26: 2.6%Period 7 of 2025-26: 5.5%Period 8 of 2025-26: 7.1%Period 9 of 2025-26: 8.7%Period 10 of 2025-26: 8.8%Period 11 of 2025-26: 5.9%Period 12 of 2025-26: 3.9%Period 13 of 2025-26: 2.9%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 8.5%Period 3 of 2026-27: 3.9%Period 4 of 2026-27: 18.2%Period 5 of 2026-27: 13.3%Period 6 of 2026-27: 4.1%Period 7 of 2026-27: 1.9%2023-242024-252025-262026-27

See how Avanti Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2772469.9%1.9%
Period 6 of 2026-2775655.6%4.1%
Period 5 of 2026-2776559.3%13.3%
Period 4 of 2026-2771962.4%18.2%
Period 3 of 2026-2775266.3%3.9%
Period 2 of 2026-2773363.3%8.5%
Period 1 of 2026-2776374.2%4.1%
Period 13 of 2025-2683274.5%2.9%
Period 12 of 2025-2676372.3%3.9%
Period 11 of 2025-2669070.7%5.9%
Period 10 of 2025-2658869.0%8.8%
Period 9 of 2025-2674452.0%8.7%
Period 8 of 2025-2677658.3%7.1%

Time of year

50%60%70%80%90%P1: 71.2%1P2: 63.6%2P3: 63.2%3P4: 62.7%4P5: 60.5%5P6: 62.8%6P7: 65.1%7P8: 59.9%8P9: 54.5%9P10: 63.4%10P11: 65.6%11P12: 68.9%12P13: 71.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Chester

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales59,28882.8%1.9%
Merseyrail40,99390.7%2.7%
Northern22,60175.4%3.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out