TransPennine Express at Chester-le-Street
All trains at Chester-le-StreetTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 12,503 scheduled stops at Chester-le-Street in the 13 periods to Period 7 of 2026-27, 90% of the station's total. 67.8% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
TransPennine Express trains at Chester-le-Street also serve Durham (8.4 km south, 73.4% on time, 3.3% cancelled), Newcastle (12.8 km north, 77.1% on time, 2.0% cancelled), Cramlington (25.9 km north, – on time, – cancelled), Morpeth (34.9 km north, 70.1% on time, 1.8% cancelled), Darlington (37.2 km south, 74.7% on time, 3.3% cancelled) and Thornaby (37.4 km south-east, 70.2% on time, 2.1% cancelled), which are the stations on its network closest to Chester-le-Street.
The busiest TransPennine Express station within 30 km of Chester-le-Street is Newcastle, 12.8 km north, with about 49 scheduled stops a day.
Of the 2 operators with enough records at Chester-le-Street, TransPennine Express is the least punctual, at 67.8%.
For TransPennine Express, Chester-le-Street is the 50th best of 77 ranked stations. Its 67.8% here is 1.0 percentage points below the 68.8% across the whole network.
TransPennine Express at Chester-le-Street has slipped a little, from 71.6% within three minutes in the previous 13 periods to 67.8% in the latest 13, a fall of 3.8 percentage points. Cancellations fell to 3.3% of scheduled stops from 4.7%, which is 1.4 percentage points fewer.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 979 | 65.3% | 1.4% |
| Period 6 of 2026-27 | 969 | 70.4% | 1.7% |
| Period 5 of 2026-27 | 979 | 64.8% | 2.7% |
| Period 4 of 2026-27 | 980 | 68.4% | 2.7% |
| Period 3 of 2026-27 | 977 | 72.7% | 1.5% |
| Period 2 of 2026-27 | 983 | 68.7% | 4.3% |
| Period 1 of 2026-27 | 1,121 | 65.2% | 2.9% |
| Period 13 of 2025-26 | 813 | 69.9% | 3.8% |
| Period 12 of 2025-26 | 979 | 72.2% | 1.9% |
| Period 11 of 2025-26 | 982 | 68.9% | 5.5% |
| Period 10 of 2025-26 | 891 | 66.2% | 4.6% |
| Period 9 of 2025-26 | 893 | 62.3% | 4.9% |
| Period 8 of 2025-26 | 957 | 66.4% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chester-le-Street
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 1,328 | 87.0% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out