Northern at Chester-le-Street
All trains at Chester-le-StreetNorthern across BritainNorth East
How this operator is doing here
Northern had 1,328 scheduled stops at Chester-le-Street in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 87.0% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Northern trains at Chester-le-Street also serve Durham (8.4 km south, 86.5% on time, 1.7% cancelled), Heworth (10.8 km north, 83.8% on time, 2.1% cancelled), Dunston (11.3 km north, 87.0% on time, 3.6% cancelled), MetroCentre (12.8 km north-west, 84.9% on time, 3.3% cancelled), Newcastle (12.8 km north, 84.1% on time, 2.4% cancelled) and Manors (13.2 km north, 85.5% on time, 2.2% cancelled), which are the stations on its network closest to Chester-le-Street.
Within 30 km of here, Northern runs best at Newton Aycliffe, 26.8 km south (88.0%), and worst at Horden, 20.1 km south-east (76.3%).
The busiest Northern station within 30 km of Chester-le-Street is Newcastle, 12.8 km north, with about 208 scheduled stops a day.
Of the 2 operators with enough records at Chester-le-Street, Northern is the most punctual, at 87.0%.
For Northern, Chester-le-Street is the 76th best of 493 ranked stations. Its 87.0% here is 8.4 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Chester-le-Street has improved each time, from 84.5% within three minutes in 2023-24 to 85.8% in 2024-25 and 88.2% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 106 | 84.8% | 0.0% |
| Period 6 of 2026-27 | 104 | 82.5% | 1.0% |
| Period 5 of 2026-27 | 104 | 87.5% | 0.0% |
| Period 4 of 2026-27 | 106 | 86.4% | 2.8% |
| Period 3 of 2026-27 | 104 | 92.9% | 4.8% |
| Period 2 of 2026-27 | 103 | 93.1% | 1.9% |
| Period 1 of 2026-27 | 120 | 90.0% | 0.0% |
| Period 13 of 2025-26 | 90 | 89.3% | 5.6% |
| Period 12 of 2025-26 | 104 | 88.5% | 0.0% |
| Period 11 of 2025-26 | 104 | 85.6% | 0.0% |
| Period 10 of 2025-26 | 89 | 78.6% | 5.6% |
| Period 9 of 2025-26 | 94 | 88.3% | 0.0% |
| Period 8 of 2025-26 | 100 | 82.0% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chester-le-Street
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,503 | 67.8% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out