Haydon Bridge
HDBNorth EastManaged by Northern Trains
How this station is performing
Haydon Bridge has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,638 scheduled stops, about 38 a day. In those periods 77.5% of stops arrived within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Haydon Bridge opened on 28 June 1836, 190 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hexham is the oldest (1835) and Haltwhistle the newest (1838), with Haydon Bridge in between.
The nearest stations to Haydon Bridge are Bardon Mill (6.2 km west), Hexham (9.7 km east), Haltwhistle (13.8 km west), Corbridge (14.6 km east) and Riding Mill (17.8 km east). 2 stations lie within 10 km in all. At 77.5%, Haydon Bridge is less punctual than all of them; the best of the five, Corbridge, manages 85.7%.
Haydon Bridge takes its name from a Village called Haydon Bridge, home to about 2,184 people, and the station stands 0.3 km from its centre.
2 of 3 stations of a similar size in North East are more punctual than Haydon Bridge on 77.5%. The comparison group includes Dunston (87.0%), Chester-le-Street (69.7%) and Nunthorpe (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,638 | 77.5% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,065 | 79.1% | 4.4% |
| Period 6 of 2026-27 | 1,064 | 82.4% | 3.4% |
| Period 5 of 2026-27 | 1,064 | 80.8% | 4.6% |
| Period 4 of 2026-27 | 1,064 | 78.4% | 3.9% |
| Period 3 of 2026-27 | 1,064 | 84.8% | 1.9% |
| Period 2 of 2026-27 | 1,065 | 78.3% | 3.8% |
| Period 1 of 2026-27 | 1,224 | – | 3.3% |
| Period 13 of 2025-26 | 1,169 | 80.1% | 3.2% |
| Period 12 of 2025-26 | 1,065 | 81.7% | 2.1% |
| Period 11 of 2025-26 | 1,030 | 80.2% | 4.5% |
| Period 10 of 2025-26 | 900 | 57.4% | 5.3% |
| Period 9 of 2025-26 | 932 | 65.4% | 2.4% |
| Period 8 of 2025-26 | 932 | 74.1% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dunston | 13,806 | 87.0% | 3.6% |
| Chester-le-Street | 13,831 | 69.7% | 3.1% |
| Nunthorpe | 13,118 | 85.7% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out