GTR at Chatham
How this operator is doing here
GTR had 26,123 scheduled stops at Chatham in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 84.5% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
GTR trains at Chatham also serve Rochester (1.4 km north-west, 80.5% on time, 4.9% cancelled), Gillingham (Kent) (2.2 km east, 81.6% on time, 5.8% cancelled), Strood (Kent) (2.3 km north-west, 83.8% on time, 4.8% cancelled), Higham (6.4 km north-west, 84.5% on time, 4.8% cancelled), Rainham (Kent) (6.5 km east, 80.6% on time, 7.2% cancelled) and Gravesend (12.6 km north-west, 82.4% on time, 4.7% cancelled), which are the stations on its network closest to Chatham.
Within 30 km of here, GTR runs best at Bat and Ball, 24.8 km south-west (91.9%), and worst at Dartford, 22.2 km west (78.2%).
The busiest GTR station within 30 km of Chatham is Gravesend, 12.6 km north-west, with about 73 scheduled stops a day.
Of the 2 operators with enough records at Chatham, GTR is the most punctual, at 84.5%.
For GTR, Chatham is the 135th best of 307 ranked stations. Its 84.5% here is 1.6 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Chatham are near its usual level: 5.0% of scheduled stops, against 4.7% across its network and 2.7% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,073 | 83.5% | 4.4% |
| Period 6 of 2026-27 | 2,047 | 81.5% | 4.9% |
| Period 5 of 2026-27 | 1,624 | 81.3% | 6.1% |
| Period 4 of 2026-27 | 2,011 | 83.9% | 4.5% |
| Period 3 of 2026-27 | 1,667 | 84.2% | 5.3% |
| Period 2 of 2026-27 | 1,961 | 84.2% | 5.4% |
| Period 1 of 2026-27 | 2,388 | 88.2% | 3.9% |
| Period 13 of 2025-26 | 2,247 | 88.7% | 2.0% |
| Period 12 of 2025-26 | 2,005 | 88.5% | 2.7% |
| Period 11 of 2025-26 | 1,954 | 84.7% | 5.1% |
| Period 10 of 2025-26 | 1,981 | 86.5% | 9.2% |
| Period 9 of 2025-26 | 2,105 | 79.6% | 8.3% |
| Period 8 of 2025-26 | 2,060 | 82.0% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chatham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 65,317 | 77.2% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out