Havant
HAVSouth EastManaged by South Western Railway
How this station is performing
Havant had 92,820 scheduled stops to Period 7 of 2026-27, about 255 a day. 74.5% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Havant opened on 15 March 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Havant is the oldest; the next oldest, Emsworth, dates from 1847.
The nearest stations to Havant are Warblington (1.0 km east), Bedhampton (1.0 km west), Emsworth (3.0 km east), Rowlands Castle (4.6 km north) and Southbourne (5.2 km east). 11 stations lie within 10 km in all. At 74.5%, Havant is less punctual than all of them; the best of the five, Rowlands Castle, manages 78.4%.
Havant takes its name from a town called Havant, home to about 45,826 people, and the station stands 0.5 km from its centre.
2 operators call at Havant: GTR (75.0%, 62% of stops) and South Western Railway (73.6%, 38% of stops). They are close together, with GTR leading on 75.0% and South Western Railway trailing on 73.6%, a gap of 1.4 percentage points.
Compared with 3 stations of a similar size in South East, Havant is the least punctual, at 74.5%. All of them are ahead, including Gillingham (Kent) (78.5%), Rochester (78.3%) and Chatham (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 57,819 | 75.0% | 5.6% |
| South Western Railway | 35,001 | 73.6% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Havant? Delay Repay
These operators call at Havant and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,174 | 69.4% | 4.1% |
| Period 6 of 2026-27 | 6,417 | 67.6% | 3.7% |
| Period 5 of 2026-27 | 7,175 | 71.1% | 4.5% |
| Period 4 of 2026-27 | 7,142 | 76.6% | 4.2% |
| Period 3 of 2026-27 | 6,913 | 78.7% | 5.3% |
| Period 2 of 2026-27 | 7,087 | 75.3% | 7.4% |
| Period 1 of 2026-27 | 8,228 | 80.3% | 3.5% |
| Period 13 of 2025-26 | 7,871 | 79.9% | 4.2% |
| Period 12 of 2025-26 | 6,773 | 77.7% | 3.8% |
| Period 11 of 2025-26 | 7,247 | 77.1% | 4.8% |
| Period 10 of 2025-26 | 6,544 | 68.3% | 5.1% |
| Period 9 of 2025-26 | 7,190 | 67.1% | 4.1% |
| Period 8 of 2025-26 | 7,059 | 76.9% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gillingham (Kent) | 92,369 | 78.5% | 2.7% |
| Rochester | 92,179 | 78.3% | 2.6% |
| Chatham | 91,440 | 79.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out