Southeastern had 65,317 scheduled stops at Chatham in the 13 periods to Period 7 of 2026-27, 71% of the station's total. 77.2% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Southeastern trains at Chatham also serve Rochester (1.4 km north-west, 77.4% on time, 1.7% cancelled), Gillingham (Kent) (2.2 km east, 77.4% on time, 1.4% cancelled), Strood (Kent) (2.3 km north-west, 87.8% on time, 1.6% cancelled), Cuxton (4.2 km west, 94.1% on time, 1.6% cancelled), Halling (6.1 km south-west, 95.0% on time, 1.6% cancelled) and Higham (6.4 km north-west, 79.5% on time, 1.8% cancelled), which are the stations on its network closest to Chatham.
Within 30 km of here, Southeastern runs best at Yalding, 18.7 km south-west (95.3%), and worst at Teynham, 20.5 km east (67.8%).
The busiest Southeastern station within 30 km of Chatham is Dartford, 22.2 km west, with about 326 scheduled stops a day.
Of the 2 operators with enough records at Chatham, Southeastern is the least punctual, at 77.2%.
For Southeastern, Chatham is the 141st best of 173 ranked stations. Its 77.2% here is 7.0 percentage points below the 84.2% across the whole network.
Southeastern at Chatham has not moved in one direction over three full railway years: 82.2% within three minutes in 2023-24, 78.5% in 2024-25 and 79.4% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,966 | 74.6% | 1.6% |
| Period 6 of 2026-27 | 5,095 | 75.2% | 1.9% |
| Period 5 of 2026-27 | 5,192 | 72.6% | 2.2% |
| Period 4 of 2026-27 | 5,190 | 78.3% | 1.8% |
| Period 3 of 2026-27 | 5,159 | 71.9% | 2.9% |
| Period 2 of 2026-27 | 4,885 | 75.2% | 3.2% |
| Period 1 of 2026-27 | 5,713 | 85.7% | 1.2% |
| Period 13 of 2025-26 | 5,397 | 81.6% | 2.0% |
| Period 12 of 2025-26 | 5,016 | 84.2% | 0.9% |
| Period 11 of 2025-26 | 4,829 | 81.7% | 1.3% |
| Period 10 of 2025-26 | 4,111 | 78.4% | 0.8% |
| Period 9 of 2025-26 | 4,925 | 70.5% | 1.3% |
| Period 8 of 2025-26 | 4,839 | 72.3% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chatham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,123 | 84.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out