Gillingham (Kent)
GLMSouth EastManaged by Southeastern
How this station is performing
Gillingham (Kent) had 92,369 scheduled stops to Period 7 of 2026-27, about 254 a day. 78.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Gillingham (Kent) opened on 24 June 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Strood (Kent) is the oldest (1845) and Rochester the newest (1892), with Gillingham (Kent) in between.
The nearest stations to Gillingham (Kent) are Chatham (2.2 km west), Rochester (3.1 km west), Strood (Kent) (3.7 km west), Rainham (Kent) (4.8 km south-east) and Cuxton (6.4 km west). 9 stations lie within 10 km in all. Of the five, Cuxton is the most punctual at 94.1% and Rainham (Kent) the least at 76.1%, with Gillingham (Kent) on 78.5%.
Gillingham (Kent) is named after Gillingham, a locality, home to about 108,483 people, but the station stands 0.9 km from its centre.
2 operators call at Gillingham (Kent): Southeastern (77.4%, 72% of stops) and GTR (81.6%, 28% of stops). They are close together, with GTR leading on 81.6% and Southeastern trailing on 77.4%, a gap of 4.2 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Gillingham (Kent) on 78.5%. The comparison group includes Rochester (78.3%), Havant (74.5%) and Chatham (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 66,209 | 77.4% | 1.4% |
| GTR | 26,160 | 81.6% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Gillingham (Kent)? Delay Repay
These operators call at Gillingham (Kent) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,113 | 76.0% | 2.4% |
| Period 6 of 2026-27 | 7,216 | 76.2% | 2.6% |
| Period 5 of 2026-27 | 6,892 | 74.1% | 2.8% |
| Period 4 of 2026-27 | 7,277 | 78.8% | 2.6% |
| Period 3 of 2026-27 | 6,920 | 74.5% | 3.3% |
| Period 2 of 2026-27 | 6,907 | 76.6% | 3.2% |
| Period 1 of 2026-27 | 8,184 | 85.7% | 2.0% |
| Period 13 of 2025-26 | 7,727 | 83.4% | 2.0% |
| Period 12 of 2025-26 | 7,091 | 84.9% | 1.4% |
| Period 11 of 2025-26 | 6,845 | 82.4% | 2.5% |
| Period 10 of 2025-26 | 6,142 | 80.1% | 3.8% |
| Period 9 of 2025-26 | 7,095 | 72.0% | 3.5% |
| Period 8 of 2025-26 | 6,960 | 74.3% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out