Chalfont and Latimer
CFOSouth EastManaged by London Underground
How this station is performing
Chalfont and Latimer has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 18,597 scheduled stops, about 51 a day. In those periods 85.0% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Chalfont and Latimer opened on 8 July 1889, 137 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Rickmansworth is the oldest (1887) and Seer Green and Jordans the newest (1914), with Chalfont and Latimer in between.
The nearest stations to Chalfont and Latimer are Amersham (3.3 km west), Chorleywood (3.3 km south-east), Rickmansworth (6.8 km south-east), Seer Green and Jordans (7.3 km south-west) and Beaconsfield (8.6 km south-west). 9 stations lie within 10 km in all. At 85.0%, Chalfont and Latimer is less punctual than all of them; the best of the five, Beaconsfield, manages 89.5%.
Chalfont and Latimer is named after Latimer, a Village, home to about 977 people, but the station stands 2.1 km from its centre.
Compared with 3 stations of a similar size in South East, Chalfont and Latimer is the least punctual, at 85.0%. All of them are ahead, including Kemsley (90.2%), Queenborough (88.9%) and Sheerness-on-Sea (88.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 18,597 | 85.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Chalfont and Latimer? Delay Repay
These operators call at Chalfont and Latimer and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,531 | 80.5% | 1.5% |
| Period 6 of 2026-27 | 1,566 | 85.7% | 4.6% |
| Period 5 of 2026-27 | 1,525 | 86.9% | 1.3% |
| Period 4 of 2026-27 | 1,516 | 85.0% | 0.7% |
| Period 3 of 2026-27 | 1,229 | 84.5% | 2.2% |
| Period 2 of 2026-27 | 1,412 | 87.2% | 0.7% |
| Period 1 of 2026-27 | 1,429 | – | 0.8% |
| Period 13 of 2025-26 | 1,578 | 89.8% | 1.3% |
| Period 12 of 2025-26 | 1,374 | 89.8% | 0.4% |
| Period 11 of 2025-26 | 1,475 | 88.0% | 2.5% |
| Period 10 of 2025-26 | 1,000 | 85.0% | 1.6% |
| Period 9 of 2025-26 | 1,577 | 79.9% | 1.8% |
| Period 8 of 2025-26 | 1,385 | 77.8% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kemsley | 18,302 | 90.2% | 1.8% |
| Queenborough | 18,302 | 88.9% | 1.8% |
| Sheerness-on-Sea | 18,301 | 88.7% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out