Queenborough
QBRSouth EastManaged by Southeastern
How this station is performing
Queenborough had 18,302 scheduled stops to Period 7 of 2026-27, about 50 a day. 88.9% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Queenborough opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Sittingbourne is the oldest (1858) and Kemsley the newest (1927), with Queenborough in between.
The nearest stations to Queenborough are Sheerness-on-Sea (2.8 km north), Swale (3.0 km south), Kemsley (6.1 km south), Sittingbourne (8.3 km south) and Newington (9.0 km south-west). 6 stations lie within 10 km in all. Of the five, Swale is the most punctual at 90.6% and Newington the least at 69.0%, with Queenborough on 88.9%.
Queenborough takes its name from a market town called Queenborough, home to about 3,916 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Queenborough was Period 9 of 2024-25, at 80.0%, some time before the latest year. The strongest was Period 1 of 2023-24, at 95.7%, and the two are 15.7 percentage points apart. Cancellations peaked at 6.4% of scheduled stops in Period 12 of 2023-24, against 1.8% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Queenborough on 88.9%. The comparison group includes Kemsley (90.2%), Sheerness-on-Sea (88.7%) and Ryde St Johns Road (98.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 18,302 | 88.9% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Queenborough? Delay Repay
These operators call at Queenborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,422 | 89.7% | 0.7% |
| Period 6 of 2026-27 | 1,396 | 83.0% | 2.1% |
| Period 5 of 2026-27 | 1,415 | 85.7% | 3.0% |
| Period 4 of 2026-27 | 1,388 | 90.2% | 2.4% |
| Period 3 of 2026-27 | 1,415 | 83.6% | 3.7% |
| Period 2 of 2026-27 | 1,349 | 88.3% | 2.0% |
| Period 1 of 2026-27 | 1,589 | 94.8% | 1.4% |
| Period 13 of 2025-26 | 1,570 | 91.7% | 2.9% |
| Period 12 of 2025-26 | 1,426 | 93.8% | 1.0% |
| Period 11 of 2025-26 | 1,386 | 92.7% | 1.6% |
| Period 10 of 2025-26 | 1,148 | 88.0% | 0.9% |
| Period 9 of 2025-26 | 1,414 | 85.8% | 0.6% |
| Period 8 of 2025-26 | 1,384 | 87.0% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kemsley | 18,302 | 90.2% | 1.8% |
| Sheerness-on-Sea | 18,301 | 88.7% | 1.7% |
| Ryde St Johns Road | 18,038 | 98.7% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out