Sheerness-on-Sea
SSSSouth EastManaged by Southeastern
How this station is performing
Sheerness-on-Sea had 18,301 scheduled stops to Period 7 of 2026-27, about 50 a day. 88.7% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Sheerness-on-Sea opened on 1 June 1883, 143 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Queenborough is the oldest (1860) and Kemsley the newest (1927), with Sheerness-on-Sea in between.
The nearest stations to Sheerness-on-Sea are Queenborough (2.8 km south), Swale (5.8 km south), Kemsley (8.9 km south), Shoeburyness (10.4 km north) and Thorpe Bay (10.8 km north). 3 stations lie within 10 km in all. Of the five, Swale is the most punctual at 90.6% and Shoeburyness the least at 85.6%, with Sheerness-on-Sea on 88.7%.
Sheerness-on-Sea is named after Sheerness, a town, home to about 13,252 people, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Sheerness-on-Sea was Period 9 of 2024-25, at 80.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 96.0%, and the two are 15.3 percentage points apart. Cancellations peaked at 6.4% of scheduled stops in Period 12 of 2023-24, against 1.7% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Sheerness-on-Sea is the least punctual, at 88.7%. All of them are ahead, including Kemsley (90.2%), Queenborough (88.9%) and Ryde St Johns Road (98.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 18,301 | 88.7% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Sheerness-on-Sea? Delay Repay
These operators call at Sheerness-on-Sea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,422 | 89.4% | 0.7% |
| Period 6 of 2026-27 | 1,396 | 81.9% | 2.1% |
| Period 5 of 2026-27 | 1,415 | 85.4% | 3.0% |
| Period 4 of 2026-27 | 1,388 | 88.5% | 2.4% |
| Period 3 of 2026-27 | 1,415 | 83.5% | 3.5% |
| Period 2 of 2026-27 | 1,349 | 87.5% | 2.0% |
| Period 1 of 2026-27 | 1,588 | 95.1% | 1.4% |
| Period 13 of 2025-26 | 1,570 | 91.9% | 2.8% |
| Period 12 of 2025-26 | 1,426 | 94.4% | 0.8% |
| Period 11 of 2025-26 | 1,386 | 92.6% | 1.6% |
| Period 10 of 2025-26 | 1,148 | 88.6% | 0.9% |
| Period 9 of 2025-26 | 1,414 | 85.7% | 0.6% |
| Period 8 of 2025-26 | 1,384 | 87.0% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kemsley | 18,302 | 90.2% | 1.8% |
| Queenborough | 18,302 | 88.9% | 1.8% |
| Ryde St Johns Road | 18,038 | 98.7% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out