How this station is performing
Cartsdyke had 24,833 scheduled stops to Period 7 of 2026-27, about 68 a day. 96.1% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Cartsdyke opened on 1 July 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenock Central is the oldest (1841) and Drumfrochar the newest (1998), with Cartsdyke in between.
The nearest stations to Cartsdyke are Whinhill (1.0 km south-west), Greenock Central (1.3 km west), Bogston (1.3 km south-east), Greenock West (2.3 km west) and Drumfrochar (2.5 km west). 18 stations lie within 10 km in all. At 96.1%, Cartsdyke is more punctual than every one of them; the best of the five, Bogston, manages 95.9%.
Cartsdyke takes its name from a suburb called Cartsdyke, and the station stands 0.5 km from its centre.
Cartsdyke is among the most punctual stations in Britain. Its 96.1% puts it 69th out of 2,374 ranked stations, with 68 ahead of it and 2,305 behind, and 12.2 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Scotland, Cartsdyke is the most punctual, at 96.1%. The comparison group includes Airbles (94.0%), Ardrossan South Beach (86.1%) and Saltcoats (90.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,833 | 96.1% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Cartsdyke? Delay Repay
These operators call at Cartsdyke and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,962 | 95.9% | 0.8% |
| Period 6 of 2026-27 | 1,976 | 96.8% | 0.6% |
| Period 5 of 2026-27 | 1,969 | 96.7% | 2.1% |
| Period 4 of 2026-27 | 1,976 | 96.8% | 0.9% |
| Period 3 of 2026-27 | 1,976 | 96.5% | 0.9% |
| Period 2 of 2026-27 | 1,976 | 96.3% | 0.6% |
| Period 1 of 2026-27 | 2,274 | 97.0% | 2.8% |
| Period 13 of 2025-26 | 1,419 | 96.9% | 2.3% |
| Period 12 of 2025-26 | 1,627 | 95.0% | 0.8% |
| Period 11 of 2025-26 | 1,976 | 97.0% | 0.6% |
| Period 10 of 2025-26 | 1,750 | 94.2% | 1.3% |
| Period 9 of 2025-26 | 1,976 | 93.8% | 2.0% |
| Period 8 of 2025-26 | 1,976 | 95.7% | 0.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Airbles | 24,818 | 94.0% | 2.0% |
| Ardrossan South Beach | 24,971 | 86.1% | 2.3% |
| Saltcoats | 24,972 | 90.0% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out