Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Airbles

AIRScotlandManaged by ScotRail

On time, last 13 periods94.0%Great Britain: 83.6%
Cancelled2.0%Great Britain: 3.2%
Stops a day68Scheduled, on average
Punctuality rank204th of 2,374Among ranked stations

How this station is performing

Airbles had 24,818 scheduled stops to Period 7 of 2026-27, about 68 a day. 94.0% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.

Airbles opened on 15 May 1989, 37 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Motherwell is the oldest (1843) and Shieldmuir the newest (1990), with Airbles in between.

The nearest stations to Airbles are Motherwell (1.1 km north), Chatelherault (2.0 km south), Shieldmuir (2.4 km east), Hamilton Central (2.9 km west) and Holytown (3.6 km north). 24 stations lie within 10 km in all. At 94.0%, Airbles is more punctual than every one of them; the best of the five, Holytown, manages 86.5%.

Airbles takes its name from a suburb called Airbles, and the station stands 0.1 km from its centre.

In Scotland, Airbles ranks 45th of 313 ranked stations. Its 94.0% is 6.3 percentage points better than the area median of 87.7%.

1 of 3 stations of a similar size in Scotland are more punctual than Airbles on 94.0%. The comparison group includes Cartsdyke (96.1%), Barassie (91.0%) and Newton-on-Ayr (90.7%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.9%Period 2 of 2023-24: 96.5%Period 3 of 2023-24: 96.4%Period 4 of 2023-24: 96.8%Period 5 of 2023-24: 96.5%Period 6 of 2023-24: 96.9%Period 7 of 2023-24: 95.4%Period 8 of 2023-24: 91.6%Period 9 of 2023-24: 92.3%Period 10 of 2023-24: 95.4%Period 11 of 2023-24: 97.5%Period 12 of 2023-24: 97.0%Period 13 of 2023-24: 96.8%Period 1 of 2024-25: 95.6%Period 2 of 2024-25: 96.2%Period 3 of 2024-25: 97.4%Period 4 of 2024-25: 96.5%Period 5 of 2024-25: 96.8%Period 6 of 2024-25: 96.9%Period 7 of 2024-25: 96.9%Period 8 of 2024-25: 90.1%Period 9 of 2024-25: 93.5%Period 10 of 2024-25: 94.5%Period 11 of 2024-25: 95.9%Period 12 of 2024-25: 96.8%Period 13 of 2024-25: 97.0%Period 1 of 2025-26: 96.4%Period 2 of 2025-26: 96.3%Period 3 of 2025-26: 97.1%Period 4 of 2025-26: 95.2%Period 5 of 2025-26: 94.9%Period 6 of 2025-26: 95.4%Period 7 of 2025-26: 93.8%Period 8 of 2025-26: 90.9%Period 9 of 2025-26: 90.4%Period 10 of 2025-26: 91.6%Period 11 of 2025-26: 96.6%Period 12 of 2025-26: 95.2%Period 13 of 2025-26: 96.0%Period 1 of 2026-27: 94.8%Period 2 of 2026-27: 94.4%Period 3 of 2026-27: 94.7%Period 4 of 2026-27: 94.5%Period 5 of 2026-27: 94.6%Period 6 of 2026-27: 94.6%Period 7 of 2026-27: 93.0%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.0%Period 2 of 2023-24: 1.4%Period 3 of 2023-24: 2.2%Period 4 of 2023-24: 1.5%Period 5 of 2023-24: 2.1%Period 6 of 2023-24: 1.3%Period 7 of 2023-24: 5.9%Period 8 of 2023-24: 2.6%Period 9 of 2023-24: 2.4%Period 10 of 2023-24: 2.6%Period 11 of 2023-24: 2.1%Period 12 of 2023-24: 1.7%Period 13 of 2023-24: 0.5%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 1.7%Period 4 of 2024-25: 1.8%Period 5 of 2024-25: 3.4%Period 6 of 2024-25: 2.0%Period 7 of 2024-25: 1.0%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 2.8%Period 10 of 2024-25: 5.3%Period 11 of 2024-25: 4.6%Period 12 of 2024-25: 0.4%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 1.8%Period 2 of 2025-26: 1.9%Period 3 of 2025-26: 1.3%Period 4 of 2025-26: 3.5%Period 5 of 2025-26: 8.3%Period 6 of 2025-26: 1.3%Period 7 of 2025-26: 2.4%Period 8 of 2025-26: 2.6%Period 9 of 2025-26: 3.1%Period 10 of 2025-26: 2.4%Period 11 of 2025-26: 1.4%Period 12 of 2025-26: 2.0%Period 13 of 2025-26: 1.4%Period 1 of 2026-27: 1.7%Period 2 of 2026-27: 1.5%Period 3 of 2026-27: 1.4%Period 4 of 2026-27: 4.0%Period 5 of 2026-27: 1.3%Period 6 of 2026-27: 1.0%Period 7 of 2026-27: 2.9%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail24,81894.0%2.0%

Operators with their own page for this station are linked to it.

Late train at Airbles? Delay Repay

These operators call at Airbles and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,89293.0%2.9%
Period 6 of 2026-271,89494.6%1.0%
Period 5 of 2026-271,89494.6%1.3%
Period 4 of 2026-271,87894.5%4.0%
Period 3 of 2026-271,86694.7%1.4%
Period 2 of 2026-271,89294.4%1.5%
Period 1 of 2026-272,14394.8%1.7%
Period 13 of 2025-262,08696.0%1.4%
Period 12 of 2025-261,89495.2%2.0%
Period 11 of 2025-261,89396.6%1.4%
Period 10 of 2025-261,69991.6%2.4%
Period 9 of 2025-261,89590.4%3.1%
Period 8 of 2025-261,89290.9%2.6%

Time of year

80%90%100%P1: 95.9%1P2: 95.8%2P3: 96.4%3P4: 95.7%4P5: 95.7%5P6: 95.9%6P7: 94.7%7P8: 90.9%8P9: 92.1%9P10: 93.8%10P11: 96.7%11P12: 96.3%12P13: 96.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Cartsdyke24,83396.1%1.2%
Barassie24,68291.0%1.5%
Newton-on-Ayr24,68290.7%1.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out