Saltcoats
SLTScotlandManaged by ScotRail
How this station is performing
Saltcoats had 24,972 scheduled stops to Period 7 of 2026-27, about 69 a day. 90.0% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Saltcoats opened on 17 August 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Saltcoats is the oldest; the next oldest, Stevenston, dates from 1840.
The nearest stations to Saltcoats are Ardrossan South Beach (1.3 km north-west), Ardrossan Town (1.9 km north-west), Stevenston (2.2 km east), Ardrossan Harbour (2.3 km west) and Kilwinning (5.3 km north-east). 8 stations lie within 10 km in all. At 90.0%, Saltcoats is more punctual than every one of them; the best of the five, Stevenston, manages 90.0%.
Saltcoats is one of 2 stations named after a town called Saltcoats, home to about 12,640 people; this one stands 0.3 km from its centre.
For Saltcoats, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 83.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.5%, which is 11.9 percentage points higher. Cancellations peaked at 6.5% of scheduled stops in Period 9 of 2025-26, against 2.2% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Saltcoats on 90.0%. The comparison group includes Stevenston (90.0%), Ardrossan South Beach (86.1%) and Milliken Park (91.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,972 | 90.0% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Saltcoats? Delay Repay
These operators call at Saltcoats and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,967 | 88.4% | 1.3% |
| Period 6 of 2026-27 | 1,966 | 90.0% | 1.2% |
| Period 5 of 2026-27 | 1,968 | 90.6% | 0.9% |
| Period 4 of 2026-27 | 1,968 | 91.4% | 1.4% |
| Period 3 of 2026-27 | 1,968 | 92.0% | 1.0% |
| Period 2 of 2026-27 | 1,968 | 90.1% | 1.3% |
| Period 1 of 2026-27 | 2,255 | 94.2% | 3.5% |
| Period 13 of 2025-26 | 1,614 | 94.8% | 1.5% |
| Period 12 of 2025-26 | 1,968 | 91.7% | 2.1% |
| Period 11 of 2025-26 | 1,968 | 88.6% | 1.0% |
| Period 10 of 2025-26 | 1,689 | 84.1% | 2.9% |
| Period 9 of 2025-26 | 1,779 | 83.6% | 6.5% |
| Period 8 of 2025-26 | 1,894 | 88.4% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stevenston | 24,972 | 90.0% | 2.2% |
| Ardrossan South Beach | 24,971 | 86.1% | 2.3% |
| Milliken Park | 25,064 | 91.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out