ScotRail at Carstairs
How this operator is doing here
ScotRail had 5,699 scheduled stops at Carstairs in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 84.5% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
ScotRail trains at Carstairs also serve Lanark (6.8 km west, 85.8% on time, 1.7% cancelled), Carluke (12.1 km west, 86.0% on time, 1.6% cancelled), Fauldhouse (14.9 km north, 90.7% on time, 1.4% cancelled), Breich (15.1 km north, 90.9% on time, 1.4% cancelled), Shotts (16.3 km north-west, 89.4% on time, 1.3% cancelled) and Hartwood (17.0 km north-west, 88.6% on time, 1.5% cancelled), which are the stations on its network closest to Carstairs.
Within 30 km of here, ScotRail runs best at Coatbridge Central, 29.6 km north-west (94.3%), and worst at Kirkwood, 29.8 km north-west (75.4%).
The busiest ScotRail station within 30 km of Carstairs is Motherwell, 23.3 km north-west, with about 190 scheduled stops a day.
Of the 2 operators with enough records at Carstairs, ScotRail is the most punctual, at 84.5%.
For ScotRail, Carstairs is the 219th best of 312 ranked stations. Its 84.5% here is 3.4 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Carstairs has improved each time, from 81.0% within three minutes in 2023-24 to 84.6% in 2024-25 and 85.0% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 460 | 84.3% | 0.4% |
| Period 6 of 2026-27 | 460 | 89.9% | 1.3% |
| Period 5 of 2026-27 | 460 | 84.0% | 1.1% |
| Period 4 of 2026-27 | 452 | 83.1% | 1.5% |
| Period 3 of 2026-27 | 460 | 87.7% | 0.7% |
| Period 2 of 2026-27 | 431 | 84.2% | 1.4% |
| Period 1 of 2026-27 | 470 | 85.1% | 1.3% |
| Period 13 of 2025-26 | 304 | 86.0% | 1.6% |
| Period 12 of 2025-26 | 460 | 89.3% | 2.2% |
| Period 11 of 2025-26 | 460 | 86.8% | 0.9% |
| Period 10 of 2025-26 | 364 | 80.1% | 1.9% |
| Period 9 of 2025-26 | 460 | 79.5% | 2.4% |
| Period 8 of 2025-26 | 458 | 77.4% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carstairs
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 607 | – | – |
| TransPennine Express | 487 | 82.3% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out