Pontlottyn
PLTWalesManaged by TfW Rail
How this station is performing
Pontlottyn had 12,342 scheduled stops to Period 7 of 2026-27, about 34 a day. 91.3% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Pontlottyn opened on 3 September 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Troed-y-rhiw is the oldest (1841) and Ebbw Vale Parkway the newest (2008), with Pontlottyn in between.
The nearest stations to Pontlottyn are Rhymney (1.6 km north-west), Tir-Phil (3.6 km south-east), Brithdir (5.4 km south-east), Ebbw Vale Parkway (5.8 km east) and Troed-y-rhiw (6.0 km south-west). 13 stations lie within 10 km in all. Of the five, Troed-y-rhiw is the most punctual at 95.2% and Ebbw Vale Parkway the least at 86.7%, with Pontlottyn on 91.3%.
Pontlottyn takes its name from a Village called Pontlottyn, home to about 1,924 people, and the station stands 2.0 km from its centre.
Pontlottyn improved sharply over the past year. In the latest 13 periods 91.3% of stops came within three minutes of the timetable, up 5.1 percentage points from 86.2% in the 13 before. Cancellations fell to 3.1% of scheduled stops from 3.8%, which is 0.7 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Pontlottyn is the most punctual, at 91.3%. The comparison group includes Brithdir (89.4%), Tir-Phil (88.9%) and Caldicot (70.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 12,342 | 91.3% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Pontlottyn? Delay Repay
These operators call at Pontlottyn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,000 | 91.5% | 1.5% |
| Period 6 of 2026-27 | 998 | 93.7% | 2.3% |
| Period 5 of 2026-27 | 921 | 92.1% | 5.5% |
| Period 4 of 2026-27 | 950 | 92.0% | 2.9% |
| Period 3 of 2026-27 | 969 | 92.8% | 2.4% |
| Period 2 of 2026-27 | 931 | 93.6% | 4.6% |
| Period 1 of 2026-27 | 1,135 | 92.8% | 4.0% |
| Period 13 of 2025-26 | 1,097 | 91.8% | 3.5% |
| Period 12 of 2025-26 | 750 | 94.5% | 1.1% |
| Period 11 of 2025-26 | 982 | 93.7% | 1.6% |
| Period 10 of 2025-26 | 881 | 88.4% | 3.4% |
| Period 9 of 2025-26 | 963 | 85.2% | 4.3% |
| Period 8 of 2025-26 | 765 | 83.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out