Transport for Wales at Caldicot
All trains at CaldicotTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 10,599 scheduled stops at Caldicot in the 13 periods to Period 7 of 2026-27, 86% of the station's total. 69.5% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
Transport for Wales trains at Caldicot also serve Severn Tunnel Junction (1.2 km west, 70.5% on time, 3.4% cancelled), Chepstow (8.7 km north-east, 68.6% on time, 3.5% cancelled), Newport (South Wales) (16.6 km west, 77.1% on time, 3.4% cancelled), Cwmbran (19.4 km north-west, 68.2% on time, 3.1% cancelled), Pye Corner (19.5 km west, 88.2% on time, 3.8% cancelled) and Rogerstone (21.2 km west, 87.1% on time, 3.8% cancelled), which are the stations on its network closest to Caldicot.
Within 30 km of here, Transport for Wales runs best at Lisvane and Thornhill, 29.8 km west (92.7%), and worst at Lydney, 21.4 km north-east (65.8%).
The busiest Transport for Wales station within 30 km of Caldicot is Llanishen, 29.7 km west, with about 145 scheduled stops a day.
Of the 2 operators with enough records at Caldicot, Transport for Wales is the least punctual, at 69.5%.
For Transport for Wales, Caldicot is the 190th best of 228 ranked stations. Its 69.5% here is 15.5 percentage points below the 85.0% across the whole network.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 834 | 62.8% | 3.4% |
| Period 6 of 2026-27 | 751 | 63.6% | 5.6% |
| Period 5 of 2026-27 | 685 | 62.6% | 13.4% |
| Period 4 of 2026-27 | 703 | 64.5% | 5.7% |
| Period 3 of 2026-27 | 839 | 71.3% | 2.0% |
| Period 2 of 2026-27 | 836 | 65.6% | 3.3% |
| Period 1 of 2026-27 | 957 | 75.5% | 1.3% |
| Period 13 of 2025-26 | 907 | 76.5% | 1.0% |
| Period 12 of 2025-26 | 837 | 77.6% | 1.7% |
| Period 11 of 2025-26 | 828 | 82.2% | 1.9% |
| Period 10 of 2025-26 | 755 | 66.3% | 2.6% |
| Period 9 of 2025-26 | 839 | 61.0% | 4.4% |
| Period 8 of 2025-26 | 828 | 67.5% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Caldicot
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 1,760 | 80.4% | 16.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out