Brithdir
BHDWalesManaged by TfW Rail
How this station is performing
Brithdir had 12,342 scheduled stops to Period 7 of 2026-27, about 34 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
The nearest stations to Brithdir are Tir-Phil (1.8 km north-west), Bargoed (1.9 km south), Gilfach Fargoed (2.9 km south), Pengam (4.4 km south) and Pontlottyn (5.4 km north-west). 16 stations lie within 10 km in all. Of the five, Pontlottyn is the most punctual at 91.3% and Gilfach Fargoed the least at 85.7%, with Brithdir on 89.4%.
Brithdir is one of 4 stations named after a Village called Brithdir; this one stands 0.0 km from its centre.
Brithdir improved sharply over the past year. In the latest 13 periods 89.4% of stops came within three minutes of the timetable, up 5.3 percentage points from 84.1% in the 13 before. Cancellations fell to 3.1% of scheduled stops from 3.8%, which is 0.7 percentage points fewer.
Across the whole run of data, the weakest four-week period for Brithdir was Period 9 of 2023-24, at 63.1%, some time before the latest year. The strongest was Period 12 of 2025-26, at 93.7%, and the two are 30.6 percentage points apart. Cancellations peaked at 13.3% of scheduled stops in Period 7 of 2025-26, against 3.1% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Brithdir on 89.4%. The comparison group includes Pontlottyn (91.3%), Tir-Phil (88.9%) and Caldicot (70.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 12,342 | 89.4% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Brithdir? Delay Repay
These operators call at Brithdir and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,000 | 89.5% | 1.7% |
| Period 6 of 2026-27 | 998 | 91.3% | 2.4% |
| Period 5 of 2026-27 | 921 | 89.7% | 5.8% |
| Period 4 of 2026-27 | 950 | 89.6% | 3.1% |
| Period 3 of 2026-27 | 969 | 91.7% | 2.4% |
| Period 2 of 2026-27 | 931 | 91.8% | 4.7% |
| Period 1 of 2026-27 | 1,135 | 91.2% | 4.0% |
| Period 13 of 2025-26 | 1,097 | 90.4% | 3.5% |
| Period 12 of 2025-26 | 750 | 93.7% | 1.1% |
| Period 11 of 2025-26 | 982 | 91.9% | 1.6% |
| Period 10 of 2025-26 | 881 | 86.5% | 3.3% |
| Period 9 of 2025-26 | 963 | 82.3% | 4.3% |
| Period 8 of 2025-26 | 765 | 81.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pontlottyn | 12,342 | 91.3% | 3.1% |
| Tir-Phil | 12,343 | 88.9% | 3.1% |
| Caldicot | 12,359 | 70.8% | 5.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out