CrossCountry at Caldicot
How this operator is doing here
CrossCountry had 1,760 scheduled stops at Caldicot in the 13 periods to Period 7 of 2026-27, 14% of the station's total. 80.4% of recorded arrivals came within three minutes and 16.1% of stops were cancelled.
CrossCountry trains at Caldicot also serve Severn Tunnel Junction (1.2 km west, 78.8% on time, 16.1% cancelled), Chepstow (8.7 km north-east, 77.6% on time, 11.8% cancelled), Newport (South Wales) (16.6 km west, 72.1% on time, 15.5% cancelled), Bristol Parkway (16.9 km south-east, 59.0% on time, 4.7% cancelled), Bristol Temple Meads (19.5 km south-east, 57.7% on time, 5.7% cancelled) and Lydney (21.4 km north-east, 74.7% on time, 13.3% cancelled), which are the stations on its network closest to Caldicot.
Within 30 km of here, CrossCountry runs best at Chepstow, 8.7 km north-east (77.6%), and worst at Bristol Temple Meads, 19.5 km south-east (57.7%).
The busiest CrossCountry station within 30 km of Caldicot is Bristol Temple Meads, 19.5 km south-east, with about 58 scheduled stops a day.
Of the 2 operators with enough records at Caldicot, CrossCountry is the most punctual, at 80.4%.
CrossCountry at Caldicot has slipped a little, from 83.1% within three minutes in the previous 13 periods to 80.4% in the latest 13, a fall of 2.7 percentage points. Cancellations rose to 16.1% of scheduled stops from 12.9%, which is 3.2 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 125 | 75.8% | 20.8% |
| Period 6 of 2026-27 | 140 | 82.0% | 28.6% |
| Period 5 of 2026-27 | 109 | 82.8% | 14.7% |
| Period 4 of 2026-27 | 140 | 82.3% | 11.4% |
| Period 3 of 2026-27 | 122 | 84.2% | 17.2% |
| Period 2 of 2026-27 | 140 | 80.6% | 26.4% |
| Period 1 of 2026-27 | 163 | 82.4% | 6.1% |
| Period 13 of 2025-26 | 152 | 72.1% | 10.5% |
| Period 12 of 2025-26 | 140 | 80.8% | 7.1% |
| Period 11 of 2025-26 | 135 | 86.3% | 8.1% |
| Period 10 of 2025-26 | 119 | 78.4% | 26.1% |
| Period 9 of 2025-26 | 140 | 74.5% | 24.3% |
| Period 8 of 2025-26 | 135 | 82.4% | 11.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Caldicot
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,599 | 69.5% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out