GTR at Bromley South
How this operator is doing here
GTR had 33,461 scheduled stops at Bromley South in the 13 periods to Period 7 of 2026-27, 24% of the station's total. 87.8% of recorded arrivals came within three minutes and 3.2% of stops were cancelled.
GTR trains at Bromley South also serve Shortlands (1.3 km north-west, 89.8% on time, 3.6% cancelled), Bickley (1.8 km east, 87.4% on time, 3.4% cancelled), Ravensbourne (2.4 km north-west, 91.3% on time, 4.0% cancelled), Beckenham Junction (3.3 km west, 98.1% on time, 3.1% cancelled), Beckenham Hill (3.7 km north-west, 90.6% on time, 4.1% cancelled) and Petts Wood (4.1 km east, 84.3% on time, 5.8% cancelled), which are the stations on its network closest to Bromley South.
Within 30 km of here, GTR runs best at Beckenham Junction, 3.3 km west (98.1%), and worst at Kenley, 11.8 km south-west (66.9%).
The busiest GTR station within 30 km of Bromley South is East Croydon, 8.2 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Bromley South, GTR is the most punctual, at 87.8%.
For GTR, Bromley South is the 90th best of 307 ranked stations. Its 87.8% here is 4.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,628 | 85.0% | 2.0% |
| Period 6 of 2026-27 | 2,568 | 83.4% | 4.3% |
| Period 5 of 2026-27 | 2,628 | 86.5% | 2.8% |
| Period 4 of 2026-27 | 2,624 | 88.5% | 2.9% |
| Period 3 of 2026-27 | 2,431 | 88.8% | 4.1% |
| Period 2 of 2026-27 | 2,356 | 89.4% | 4.1% |
| Period 1 of 2026-27 | 2,881 | 93.3% | 1.0% |
| Period 13 of 2025-26 | 2,862 | 90.7% | 2.8% |
| Period 12 of 2025-26 | 2,560 | 90.4% | 2.5% |
| Period 11 of 2025-26 | 2,596 | 88.5% | 2.5% |
| Period 10 of 2025-26 | 2,138 | 88.9% | 5.4% |
| Period 9 of 2025-26 | 2,628 | 83.3% | 5.7% |
| Period 8 of 2025-26 | 2,561 | 84.5% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bromley South
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 105,384 | 80.6% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out