CrossCountry at Bristol Parkway
All trains at Bristol ParkwayCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 20,405 scheduled stops at Bristol Parkway in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 59.0% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
CrossCountry trains at Bristol Parkway also serve Bristol Temple Meads (7.7 km south, 57.7% on time, 5.7% cancelled), Yate (8.3 km east, – on time, – cancelled), Chepstow (16.6 km north-west, 77.6% on time, 11.8% cancelled), Caldicot (16.9 km north-west, 80.4% on time, 16.1% cancelled), Severn Tunnel Junction (18.0 km north-west, 78.8% on time, 16.1% cancelled) and Lydney (22.3 km north, 74.7% on time, 13.3% cancelled), which are the stations on its network closest to Bristol Parkway.
Within 30 km of here, CrossCountry runs best at Chepstow, 16.6 km north-west (77.6%), and worst at Bristol Temple Meads, 7.7 km south (57.7%).
The busiest CrossCountry station within 30 km of Bristol Parkway is Bristol Temple Meads, 7.7 km south, with about 58 scheduled stops a day.
CrossCountry at Bristol Parkway has slipped sharply. 59.0% of stops came within three minutes of the timetable in the latest 13 periods, 6.0 percentage points worse than the 65.0% recorded in the 13 before. Cancellations rose to 4.7% of scheduled stops from 3.9%, which is 0.8 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,480 | 55.1% | 5.3% |
| Period 6 of 2026-27 | 1,574 | 48.3% | 9.7% |
| Period 5 of 2026-27 | 1,577 | 49.1% | 5.1% |
| Period 4 of 2026-27 | 1,575 | 52.8% | 5.2% |
| Period 3 of 2026-27 | 1,535 | 57.8% | 3.3% |
| Period 2 of 2026-27 | 1,567 | 59.2% | 3.5% |
| Period 1 of 2026-27 | 1,738 | 66.2% | 1.8% |
| Period 13 of 2025-26 | 1,744 | 65.6% | 3.0% |
| Period 12 of 2025-26 | 1,584 | 72.4% | 3.2% |
| Period 11 of 2025-26 | 1,559 | 72.0% | 4.7% |
| Period 10 of 2025-26 | 1,391 | 61.0% | 6.7% |
| Period 9 of 2025-26 | 1,565 | 47.4% | 7.7% |
| Period 8 of 2025-26 | 1,516 | 56.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bristol Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 43,641 | 69.6% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out