How this operator is doing here
Great Western Railway had 43,641 scheduled stops at Bristol Parkway in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 69.6% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
Great Western Railway trains at Bristol Parkway also serve Filton Abbey Wood (1.9 km south-west, 77.2% on time, 5.3% cancelled), Patchway (1.9 km north-west, 80.1% on time, 3.1% cancelled), Ashley Down (4.6 km south-west, 84.7% on time, 7.9% cancelled), Stapleton Road (5.4 km south, 79.2% on time, 4.6% cancelled), Montpelier (6.0 km south-west, 74.5% on time, 3.5% cancelled) and Redland (6.3 km south-west, 73.3% on time, 3.5% cancelled), which are the stations on its network closest to Bristol Parkway.
Within 30 km of here, Great Western Railway runs best at Ashley Down, 4.6 km south-west (84.7%), and worst at Bath Spa, 19.9 km south-east (68.5%).
The busiest Great Western Railway station within 30 km of Bristol Parkway is Bristol Temple Meads, 7.7 km south, with about 333 scheduled stops a day.
Of the 2 operators with enough records at Bristol Parkway, Great Western Railway is the most punctual, at 69.6%.
Over three full railway years Great Western Railway at Bristol Parkway has improved each time, from 63.6% within three minutes in 2023-24 to 70.7% in 2024-25 and 73.0% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,391 | 67.3% | 3.5% |
| Period 6 of 2026-27 | 3,415 | 60.7% | 6.4% |
| Period 5 of 2026-27 | 3,201 | 59.7% | 7.4% |
| Period 4 of 2026-27 | 2,941 | 66.2% | 4.7% |
| Period 3 of 2026-27 | 3,345 | 72.9% | 6.4% |
| Period 2 of 2026-27 | 3,403 | 72.0% | 4.3% |
| Period 1 of 2026-27 | 3,866 | 76.1% | 2.7% |
| Period 13 of 2025-26 | 3,747 | 77.2% | 2.3% |
| Period 12 of 2025-26 | 3,352 | 79.0% | 2.4% |
| Period 11 of 2025-26 | 3,265 | 74.6% | 2.7% |
| Period 10 of 2025-26 | 2,916 | 66.5% | 4.5% |
| Period 9 of 2025-26 | 3,392 | 59.1% | 7.6% |
| Period 8 of 2025-26 | 3,407 | 69.6% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bristol Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 20,405 | 59.0% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out