Southeastern at Blackheath
How this operator is doing here
Southeastern had 88,570 scheduled stops at Blackheath in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 87.6% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Southeastern trains at Blackheath also serve Kidbrooke (1.4 km east, 85.1% on time, 2.1% cancelled), Lewisham (1.5 km west, 87.0% on time, 1.5% cancelled), Hither Green (1.7 km south, 87.7% on time, 1.3% cancelled), Lee (London) (1.8 km south, 87.6% on time, 1.4% cancelled), Maze Hill (1.9 km north, 90.8% on time, 1.8% cancelled) and Greenwich (2.1 km north-west, 89.5% on time, 1.8% cancelled), which are the stations on its network closest to Blackheath.
Within 30 km of here, Southeastern runs best at Sundridge Park, 5.8 km south (99.4%), and worst at Sevenoaks, 24.3 km south-east (72.3%).
The busiest Southeastern station within 30 km of Blackheath is London Bridge, 7.8 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Blackheath, Southeastern is the least punctual, at 87.6%.
For Southeastern, Blackheath is the 51st best of 173 ranked stations. Its 87.6% here is 3.4 percentage points above the 84.2% across the whole network.
Southeastern at Blackheath has not moved in one direction over three full railway years: 90.4% within three minutes in 2023-24, 87.1% in 2024-25 and 88.2% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,626 | 88.1% | 1.2% |
| Period 6 of 2026-27 | 6,867 | 86.5% | 1.0% |
| Period 5 of 2026-27 | 6,432 | 86.7% | 2.4% |
| Period 4 of 2026-27 | 7,072 | 87.5% | 1.4% |
| Period 3 of 2026-27 | 6,953 | 85.3% | 3.1% |
| Period 2 of 2026-27 | 6,658 | 86.4% | 4.3% |
| Period 1 of 2026-27 | 8,038 | 90.2% | 1.7% |
| Period 13 of 2025-26 | 6,985 | 89.0% | 1.6% |
| Period 12 of 2025-26 | 7,278 | 88.7% | 1.4% |
| Period 11 of 2025-26 | 6,425 | 88.8% | 1.0% |
| Period 10 of 2025-26 | 5,515 | 89.6% | 1.5% |
| Period 9 of 2025-26 | 6,973 | 86.5% | 1.3% |
| Period 8 of 2025-26 | 6,748 | 85.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Blackheath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 387 | 91.6% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out