LNER at Berwick-upon-Tweed
All trains at Berwick-upon-TweedLNER across BritainNorth East
How this operator is doing here
LNER had 8,716 scheduled stops at Berwick-upon-Tweed in the 13 periods to Period 7 of 2026-27, 37% of the station's total. 64.2% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
LNER trains at Berwick-upon-Tweed also serve Reston (14.1 km north-west, 87.0% on time, 0.9% cancelled), Dunbar (40.0 km north-west, 75.9% on time, 1.4% cancelled), Alnmouth (48.5 km south-east, 62.9% on time, 1.7% cancelled), Morpeth (71.1 km south, 69.4% on time, 1.6% cancelled), Edinburgh (76.2 km west, 72.5% on time, 2.4% cancelled) and Haymarket (77.8 km west, 51.2% on time, 1.3% cancelled), which are the stations on its network closest to Berwick-upon-Tweed.
The busiest LNER station within 30 km of Berwick-upon-Tweed is Reston, 14.1 km north-west, with about 2 scheduled stops a day.
Of the 3 operators with enough records at Berwick-upon-Tweed, LNER is the least punctual, at 64.2%.
For LNER, Berwick-upon-Tweed is the 23rd best of 35 ranked stations. Its 64.2% here is 3.4 percentage points below the 67.6% across the whole network.
LNER at Berwick-upon-Tweed has slipped a little, from 68.7% within three minutes in the previous 13 periods to 64.2% in the latest 13, a fall of 4.5 percentage points. Cancellations held steady at 1.2% of scheduled stops, against 1.5% before.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 531 | 60.6% | 0.2% |
| Period 6 of 2026-27 | 602 | 62.6% | 1.3% |
| Period 5 of 2026-27 | 625 | 60.9% | 1.0% |
| Period 4 of 2026-27 | 620 | 60.4% | 1.1% |
| Period 3 of 2026-27 | 624 | 62.3% | 1.9% |
| Period 2 of 2026-27 | 622 | 64.4% | 0.6% |
| Period 1 of 2026-27 | 712 | 61.5% | 0.7% |
| Period 13 of 2025-26 | 684 | 71.7% | 0.4% |
| Period 12 of 2025-26 | 625 | 70.0% | 1.4% |
| Period 11 of 2025-26 | 626 | 67.8% | 2.2% |
| Period 10 of 2025-26 | 632 | 63.1% | 0.6% |
| Period 9 of 2025-26 | 906 | 62.7% | 2.5% |
| Period 8 of 2025-26 | 907 | 65.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Berwick-upon-Tweed
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 9,355 | 67.4% | 3.3% |
| TransPennine Express | 5,610 | 78.1% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out