TransPennine Express at Berwick-upon-Tweed
All trains at Berwick-upon-TweedTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 5,610 scheduled stops at Berwick-upon-Tweed in the 13 periods to Period 7 of 2026-27, 24% of the station's total. 78.1% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
TransPennine Express trains at Berwick-upon-Tweed also serve Reston (14.1 km north-west, 75.6% on time, 1.7% cancelled), Dunbar (40.0 km north-west, 75.5% on time, 1.7% cancelled), East Linton (47.1 km north-west, 74.9% on time, 1.7% cancelled), Alnmouth (48.5 km south-east, 71.3% on time, 1.8% cancelled), Morpeth (71.1 km south, 70.1% on time, 1.8% cancelled) and Edinburgh (76.2 km west, 78.5% on time, 2.6% cancelled), which are the stations on its network closest to Berwick-upon-Tweed.
The busiest TransPennine Express station within 30 km of Berwick-upon-Tweed is Reston, 14.1 km north-west, with about 15 scheduled stops a day.
Of the 3 operators with enough records at Berwick-upon-Tweed, TransPennine Express is the most punctual, at 78.1%.
For TransPennine Express, Berwick-upon-Tweed is the 9th best of 77 ranked stations. Its 78.1% here is 9.3 percentage points above the 68.8% across the whole network.
TransPennine Express at Berwick-upon-Tweed has slipped a little, from 80.5% within three minutes in the previous 13 periods to 78.1% in the latest 13, a fall of 2.4 percentage points. Cancellations fell to 1.7% of scheduled stops from 2.4%, which is 0.7 percentage points fewer.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 364 | 71.7% | 0.0% |
| Period 6 of 2026-27 | 448 | 81.5% | 2.2% |
| Period 5 of 2026-27 | 480 | 71.2% | 1.0% |
| Period 4 of 2026-27 | 435 | 74.6% | 3.2% |
| Period 3 of 2026-27 | 438 | 79.3% | 0.7% |
| Period 2 of 2026-27 | 440 | 84.8% | 5.7% |
| Period 1 of 2026-27 | 497 | 78.4% | 1.2% |
| Period 13 of 2025-26 | 480 | 82.9% | 0.2% |
| Period 12 of 2025-26 | 440 | 81.1% | 2.5% |
| Period 11 of 2025-26 | 440 | 81.6% | 1.4% |
| Period 10 of 2025-26 | 386 | 74.4% | 0.0% |
| Period 9 of 2025-26 | 382 | 74.6% | 1.0% |
| Period 8 of 2025-26 | 380 | 77.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Berwick-upon-Tweed
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 9,355 | 67.4% | 3.3% |
| LNER | 8,716 | 64.2% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out