Sunderland
SUNNorth EastManaged by Northern Trains
How this station is performing
Sunderland had 24,015 scheduled stops to Period 7 of 2026-27, about 66 a day. 75.3% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Sunderland opened on 3 August 1879, 147 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sunderland is the newest; the oldest, Heworth, opened in 1839.
The nearest stations to Sunderland are Seaham (7.8 km south), Heworth (12.3 km north-west), Chester-le-Street (13.7 km south-west), Manors (16.1 km north-west) and Newcastle (16.5 km north-west). 1 stations lie within 10 km in all. Of the five, Manors is the most punctual at 85.5% and Chester-le-Street the least at 69.7%, with Sunderland on 75.3%.
Sunderland is one of 4 stations named after a big city called Sunderland, home to about 277,417 people; this one stands 0.2 km from its centre.
2 operators call at Sunderland: Northern (77.1%, 84% of stops) and Grand Central (66.3%, 16% of stops). The operator you travel with matters: Northern reaches 77.1% within three minutes while Grand Central manages 66.3%, a gap of 10.8 percentage points.
1 of 3 stations of a similar size in North East are more punctual than Sunderland on 75.3%. The comparison group includes Saltburn (89.2%), Berwick-upon-Tweed (68.7%) and Hartlepool (74.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,128 | 77.1% | 2.6% |
| Grand Central | 3,887 | 66.3% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Sunderland? Delay Repay
These operators call at Sunderland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,959 | 74.4% | 2.7% |
| Period 6 of 2026-27 | 1,948 | 79.0% | 2.3% |
| Period 5 of 2026-27 | 1,959 | 75.9% | 4.0% |
| Period 4 of 2026-27 | 1,576 | 73.9% | 2.2% |
| Period 3 of 2026-27 | 1,877 | 79.5% | 1.4% |
| Period 2 of 2026-27 | 1,812 | 77.8% | 2.9% |
| Period 1 of 2026-27 | 2,248 | 79.3% | 1.3% |
| Period 13 of 2025-26 | 2,097 | 77.8% | 1.7% |
| Period 12 of 2025-26 | 1,889 | 78.8% | 2.0% |
| Period 11 of 2025-26 | 1,946 | 77.8% | 2.3% |
| Period 10 of 2025-26 | 1,618 | 69.7% | 4.8% |
| Period 9 of 2025-26 | 1,561 | 63.5% | 2.5% |
| Period 8 of 2025-26 | 1,525 | 65.8% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saltburn | 23,994 | 89.2% | 4.1% |
| Berwick-upon-Tweed | 23,681 | 68.7% | 2.2% |
| Hartlepool | 24,521 | 74.2% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out