Bedhampton
BDHSouth EastManaged by South Western Railway
How this station is performing
Bedhampton had 19,833 scheduled stops to Period 7 of 2026-27, about 54 a day. 77.9% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Bedhampton opened on 1 April 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Havant is the oldest (1847) and Warblington the newest (1907), with Bedhampton in between.
The nearest stations to Bedhampton are Havant (1.0 km east), Warblington (2.0 km east), Emsworth (4.0 km east), Rowlands Castle (5.1 km north-east) and Cosham (5.2 km west). 11 stations lie within 10 km in all. Of the five, Rowlands Castle is the most punctual at 78.4% and Cosham the least at 71.7%, with Bedhampton on 77.9%.
Bedhampton takes its name from a Village called Bedhampton, home to about 8,835 people, and the station stands 0.5 km from its centre.
2 operators call at Bedhampton: South Western Railway (78.4%, 84% of stops) and GTR (75.1%, 16% of stops). They are close together, with South Western Railway leading on 78.4% and GTR trailing on 75.1%, a gap of 3.3 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Bedhampton on 77.9%. The comparison group includes Robertsbridge (77.3%), Etchingham (76.8%) and Longcross (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 16,607 | 78.4% | 2.7% |
| GTR | 3,226 | 75.1% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Bedhampton? Delay Repay
These operators call at Bedhampton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,531 | 75.6% | 3.0% |
| Period 6 of 2026-27 | 1,492 | 79.2% | 1.5% |
| Period 5 of 2026-27 | 1,536 | 78.9% | 2.9% |
| Period 4 of 2026-27 | 1,518 | 80.4% | 2.6% |
| Period 3 of 2026-27 | 1,511 | 84.2% | 2.5% |
| Period 2 of 2026-27 | 1,444 | 78.3% | 8.8% |
| Period 1 of 2026-27 | 1,655 | 83.2% | 3.0% |
| Period 13 of 2025-26 | 1,602 | 80.9% | 2.7% |
| Period 12 of 2025-26 | 1,460 | 81.7% | 2.2% |
| Period 11 of 2025-26 | 1,534 | 78.6% | 2.0% |
| Period 10 of 2025-26 | 1,410 | 64.3% | 3.8% |
| Period 9 of 2025-26 | 1,546 | 65.8% | 2.2% |
| Period 8 of 2025-26 | 1,594 | 79.9% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Robertsbridge | 19,761 | 77.3% | 1.8% |
| Etchingham | 19,745 | 76.8% | 1.8% |
| Longcross | 19,942 | 86.1% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out