South Western Railway at Bedhampton
All trains at BedhamptonSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 16,607 scheduled stops at Bedhampton in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 78.4% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
South Western Railway trains at Bedhampton also serve Havant (1.0 km east, 73.6% on time, 2.8% cancelled), Rowlands Castle (5.1 km north-east, 78.4% on time, 3.2% cancelled), Cosham (5.2 km west, 71.0% on time, 3.1% cancelled), Hilsea (5.2 km south-west, 75.7% on time, 2.5% cancelled), Fratton (8.4 km south-west, 73.2% on time, 2.4% cancelled) and Portchester (9.1 km west, 73.8% on time, 3.0% cancelled), which are the stations on its network closest to Bedhampton.
Within 30 km of here, South Western Railway runs best at Shanklin, 27.7 km south-west (98.9%), and worst at Southampton Central, 29.9 km west (68.0%).
The busiest South Western Railway station within 30 km of Bedhampton is Southampton Central, 29.9 km west, with about 189 scheduled stops a day.
Of the 2 operators with enough records at Bedhampton, South Western Railway is the most punctual, at 78.4%.
Over three full railway years South Western Railway at Bedhampton has got worse each time, from 86.3% within three minutes in 2023-24 to 82.8% in 2024-25 and 79.1% in 2025-26.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,247 | 76.2% | 3.1% |
| Period 6 of 2026-27 | 1,303 | 80.6% | 1.4% |
| Period 5 of 2026-27 | 1,314 | 80.4% | 2.6% |
| Period 4 of 2026-27 | 1,297 | 81.2% | 2.2% |
| Period 3 of 2026-27 | 1,291 | 85.5% | 2.4% |
| Period 2 of 2026-27 | 1,062 | 80.1% | 6.3% |
| Period 1 of 2026-27 | 1,373 | 84.5% | 2.9% |
| Period 13 of 2025-26 | 1,271 | 81.5% | 2.0% |
| Period 12 of 2025-26 | 1,275 | 82.1% | 2.1% |
| Period 11 of 2025-26 | 1,314 | 77.8% | 2.1% |
| Period 10 of 2025-26 | 1,164 | 63.9% | 3.7% |
| Period 9 of 2025-26 | 1,324 | 63.4% | 2.3% |
| Period 8 of 2025-26 | 1,372 | 80.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bedhampton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 3,226 | 75.1% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out