Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Bedhampton

All trains at BedhamptonGTR across BritainSouth East

On time, last 13 periods75.1%Whole station: 77.9%
Cancelled5.0%Whole station: 3.1%
Scheduled stops3,226Of 19,833 at the station

How this operator is doing here

GTR had 3,226 scheduled stops at Bedhampton in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 75.1% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.

GTR trains at Bedhampton also serve Havant (1.0 km east, 75.0% on time, 5.6% cancelled), Warblington (2.0 km east, 75.1% on time, 6.1% cancelled), Emsworth (4.0 km east, 76.7% on time, 5.8% cancelled), Cosham (5.2 km west, 75.5% on time, 5.7% cancelled), Hilsea (5.2 km south-west, 78.6% on time, 7.1% cancelled) and Southbourne (6.3 km east, 75.8% on time, 5.9% cancelled), which are the stations on its network closest to Bedhampton.

Within 30 km of here, GTR runs best at Bognor Regis, 23.7 km east (89.2%), and worst at Bosham, 10.5 km east (71.6%).

The busiest GTR station within 30 km of Bedhampton is Barnham, 25.1 km east, with about 331 scheduled stops a day.

Of the 2 operators with enough records at Bedhampton, GTR is the least punctual, at 75.1%.

GTR at Bedhampton has slipped a little, from 78.9% within three minutes in the previous 13 periods to 75.1% in the latest 13, a fall of 3.8 percentage points. Cancellations rose to 5.0% of scheduled stops from 2.9%, which is 2.1 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 83.9%Period 2 of 2023-24: 84.4%Period 3 of 2023-24: 75.7%Period 4 of 2023-24: 76.4%Period 5 of 2023-24: 81.2%Period 6 of 2023-24: 85.0%Period 7 of 2023-24: 78.1%Period 8 of 2023-24: 67.8%Period 9 of 2023-24: 69.4%Period 10 of 2023-24: 74.8%Period 11 of 2023-24: 81.0%Period 12 of 2023-24: 84.9%Period 13 of 2023-24: 85.1%Period 1 of 2024-25: 78.1%Period 2 of 2024-25: 78.8%Period 3 of 2024-25: 82.6%Period 4 of 2024-25: 83.5%Period 5 of 2024-25: 83.0%Period 6 of 2024-25: 78.0%Period 7 of 2024-25: 87.8%Period 8 of 2024-25: 70.2%Period 9 of 2024-25: 75.4%Period 10 of 2024-25: 75.2%Period 11 of 2024-25: 81.8%Period 12 of 2024-25: 77.1%Period 13 of 2024-25: 85.3%Period 1 of 2025-26: 80.8%Period 2 of 2025-26: 80.7%Period 3 of 2025-26: 88.5%Period 4 of 2025-26: 76.4%Period 5 of 2025-26: 69.1%Period 6 of 2025-26: 83.3%Period 7 of 2025-26: 80.1%Period 8 of 2025-26: 75.1%Period 9 of 2025-26: 80.3%Period 10 of 2025-26: 66.4%Period 11 of 2025-26: 83.4%Period 12 of 2025-26: 79.4%Period 13 of 2025-26: 78.3%Period 1 of 2026-27: 76.8%Period 2 of 2026-27: 72.8%Period 3 of 2026-27: 77.0%Period 4 of 2026-27: 75.7%Period 5 of 2026-27: 69.8%Period 6 of 2026-27: 69.6%Period 7 of 2026-27: 72.8%
This pageGreat Britain
0%5%10%15%20%Period 1 of 2023-24: 1.7%Period 2 of 2023-24: 5.7%Period 3 of 2023-24: 2.7%Period 4 of 2023-24: 5.7%Period 5 of 2023-24: 3.2%Period 6 of 2023-24: 4.4%Period 7 of 2023-24: 1.5%Period 8 of 2023-24: 2.0%Period 9 of 2023-24: 3.1%Period 10 of 2023-24: 11.4%Period 11 of 2023-24: 0.9%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.7%Period 1 of 2024-25: 5.6%Period 2 of 2024-25: 2.5%Period 3 of 2024-25: 3.6%Period 4 of 2024-25: 0.9%Period 5 of 2024-25: 3.2%Period 6 of 2024-25: 3.2%Period 7 of 2024-25: 5.2%Period 8 of 2024-25: 11.1%Period 9 of 2024-25: 2.9%Period 10 of 2024-25: 3.3%Period 11 of 2024-25: 2.7%Period 12 of 2024-25: 3.6%Period 13 of 2024-25: 0.4%Period 1 of 2025-26: 1.9%Period 2 of 2025-26: 0.5%Period 3 of 2025-26: 1.4%Period 4 of 2025-26: 4.2%Period 5 of 2025-26: 2.3%Period 6 of 2025-26: 2.1%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 4.1%Period 9 of 2025-26: 1.8%Period 10 of 2025-26: 4.5%Period 11 of 2025-26: 1.4%Period 12 of 2025-26: 2.7%Period 13 of 2025-26: 5.4%Period 1 of 2026-27: 3.5%Period 2 of 2026-27: 15.7%Period 3 of 2026-27: 3.2%Period 4 of 2026-27: 5.0%Period 5 of 2026-27: 4.5%Period 6 of 2026-27: 2.6%Period 7 of 2026-27: 2.5%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2728472.8%2.5%
Period 6 of 2026-2718969.6%2.6%
Period 5 of 2026-2722269.8%4.5%
Period 4 of 2026-2722175.7%5.0%
Period 3 of 2026-2722077.0%3.2%
Period 2 of 2026-2738272.8%15.7%
Period 1 of 2026-2728276.8%3.5%
Period 13 of 2025-2633178.3%5.4%
Period 12 of 2025-2618579.4%2.7%
Period 11 of 2025-2622083.4%1.4%
Period 10 of 2025-2624666.4%4.5%
Period 9 of 2025-2622280.3%1.8%
Period 8 of 2025-2622275.1%4.1%

Time of year

70%80%90%P1: 80.7%1P2: 80.3%2P3: 79.1%3P4: 77.3%4P5: 78.2%5P6: 81.7%6P7: 78.5%7P8: 69.3%8P9: 72.3%9P10: 73.3%10P11: 81.5%11P12: 83.3%12P13: 83.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Bedhampton

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway16,60778.4%2.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out