GTR had 3,226 scheduled stops at Bedhampton in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 75.1% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
GTR trains at Bedhampton also serve Havant (1.0 km east, 75.0% on time, 5.6% cancelled), Warblington (2.0 km east, 75.1% on time, 6.1% cancelled), Emsworth (4.0 km east, 76.7% on time, 5.8% cancelled), Cosham (5.2 km west, 75.5% on time, 5.7% cancelled), Hilsea (5.2 km south-west, 78.6% on time, 7.1% cancelled) and Southbourne (6.3 km east, 75.8% on time, 5.9% cancelled), which are the stations on its network closest to Bedhampton.
Within 30 km of here, GTR runs best at Bognor Regis, 23.7 km east (89.2%), and worst at Bosham, 10.5 km east (71.6%).
The busiest GTR station within 30 km of Bedhampton is Barnham, 25.1 km east, with about 331 scheduled stops a day.
Of the 2 operators with enough records at Bedhampton, GTR is the least punctual, at 75.1%.
GTR at Bedhampton has slipped a little, from 78.9% within three minutes in the previous 13 periods to 75.1% in the latest 13, a fall of 3.8 percentage points. Cancellations rose to 5.0% of scheduled stops from 2.9%, which is 2.1 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 284 | 72.8% | 2.5% |
| Period 6 of 2026-27 | 189 | 69.6% | 2.6% |
| Period 5 of 2026-27 | 222 | 69.8% | 4.5% |
| Period 4 of 2026-27 | 221 | 75.7% | 5.0% |
| Period 3 of 2026-27 | 220 | 77.0% | 3.2% |
| Period 2 of 2026-27 | 382 | 72.8% | 15.7% |
| Period 1 of 2026-27 | 282 | 76.8% | 3.5% |
| Period 13 of 2025-26 | 331 | 78.3% | 5.4% |
| Period 12 of 2025-26 | 185 | 79.4% | 2.7% |
| Period 11 of 2025-26 | 220 | 83.4% | 1.4% |
| Period 10 of 2025-26 | 246 | 66.4% | 4.5% |
| Period 9 of 2025-26 | 222 | 80.3% | 1.8% |
| Period 8 of 2025-26 | 222 | 75.1% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bedhampton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 16,607 | 78.4% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out