Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Longcross

LNGSouth EastManaged by South Western Railway

On time, last 13 periods86.1%Great Britain: 83.6%
Cancelled2.3%Great Britain: 3.2%
Stops a day55Scheduled, on average
Punctuality rank958th of 2,374Among ranked stations

How this station is performing

Longcross had 19,942 scheduled stops to Period 7 of 2026-27, about 55 a day. 86.1% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.

Longcross opened on 21 September 1942, 84 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Longcross is the newest; the oldest, Chertsey, opened in 1848.

The nearest stations to Longcross are Sunningdale (2.8 km west), Virginia Water (2.9 km north-east), Chertsey (5.9 km east), Egham (5.9 km north-east) and Ascot (Berks) (6.1 km west). 16 stations lie within 10 km in all. Of the five, Ascot (Berks) is the most punctual at 91.8% and Chertsey the least at 84.6%, with Longcross on 86.1%.

Longcross takes its name from a Village called Longcross, home to about 943 people, and the station stands 1.1 km from its centre.

Longcross improved sharply over the past year. In the latest 13 periods 86.1% of stops came within three minutes of the timetable, up 6.4 percentage points from 79.7% in the 13 before. Cancellations held steady at 2.3% of scheduled stops, against 2.2% before.

Compared with 3 stations of a similar size in South East, Longcross is the most punctual, at 86.1%. The comparison group includes Bedhampton (77.9%), Robertsbridge (77.3%) and Etchingham (76.8%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 88.2%Period 2 of 2023-24: 90.0%Period 3 of 2023-24: 85.5%Period 4 of 2023-24: 83.1%Period 5 of 2023-24: 86.4%Period 6 of 2023-24: 84.6%Period 7 of 2023-24: 82.1%Period 8 of 2023-24: 71.5%Period 9 of 2023-24: 63.5%Period 10 of 2023-24: 78.1%Period 11 of 2023-24: 85.3%Period 12 of 2023-24: 85.1%Period 13 of 2023-24: 88.4%Period 1 of 2024-25: 88.5%Period 2 of 2024-25: 87.7%Period 3 of 2024-25: 87.1%Period 4 of 2024-25: 85.6%Period 5 of 2024-25: 87.0%Period 6 of 2024-25: 82.2%Period 7 of 2024-25: 83.2%Period 8 of 2024-25: 76.4%Period 9 of 2024-25: 60.7%Period 10 of 2024-25: 66.2%Period 11 of 2024-25: 81.4%Period 12 of 2024-25: 83.3%Period 13 of 2024-25: 85.6%Period 1 of 2025-26: 82.0%Period 2 of 2025-26: 84.7%Period 3 of 2025-26: 81.0%Period 4 of 2025-26: 83.3%Period 5 of 2025-26: 85.5%Period 6 of 2025-26: 84.8%Period 7 of 2025-26: 80.4%Period 8 of 2025-26: 75.3%Period 9 of 2025-26: 73.9%Period 10 of 2025-26: 86.0%Period 11 of 2025-26: 86.9%Period 12 of 2025-26: 88.0%Period 13 of 2025-26: 89.1%Period 1 of 2026-27: 91.5%Period 2 of 2026-27: 89.0%Period 3 of 2026-27: 86.8%Period 4 of 2026-27: 88.6%Period 5 of 2026-27: 87.5%Period 6 of 2026-27: 87.4%Period 7 of 2026-27: 88.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 2.0%Period 2 of 2023-24: 0.3%Period 3 of 2023-24: 2.8%Period 4 of 2023-24: 4.1%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 2.5%Period 8 of 2023-24: 2.2%Period 9 of 2023-24: 2.7%Period 10 of 2023-24: 4.0%Period 11 of 2023-24: 1.8%Period 12 of 2023-24: 0.6%Period 13 of 2023-24: 2.2%Period 1 of 2024-25: 3.0%Period 2 of 2024-25: 1.8%Period 3 of 2024-25: 1.7%Period 4 of 2024-25: 0.7%Period 5 of 2024-25: 1.7%Period 6 of 2024-25: 1.9%Period 7 of 2024-25: 4.2%Period 8 of 2024-25: 3.8%Period 9 of 2024-25: 3.5%Period 10 of 2024-25: 2.8%Period 11 of 2024-25: 2.4%Period 12 of 2024-25: 2.6%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 1.8%Period 2 of 2025-26: 0.7%Period 3 of 2025-26: 1.2%Period 4 of 2025-26: 2.2%Period 5 of 2025-26: 3.3%Period 6 of 2025-26: 1.7%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 3.8%Period 9 of 2025-26: 2.1%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 1.7%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 2.3%Period 2 of 2026-27: 4.0%Period 3 of 2026-27: 2.5%Period 4 of 2026-27: 3.1%Period 5 of 2026-27: 1.3%Period 6 of 2026-27: 1.5%Period 7 of 2026-27: 1.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway19,94286.1%2.3%

Operators with their own page for this station are linked to it.

Late train at Longcross? Delay Repay

These operators call at Longcross and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,28688.1%1.4%
Period 6 of 2026-271,49687.4%1.5%
Period 5 of 2026-271,55887.5%1.3%
Period 4 of 2026-271,50088.6%3.1%
Period 3 of 2026-271,53086.8%2.5%
Period 2 of 2026-271,55989.0%4.0%
Period 1 of 2026-271,74091.5%2.3%
Period 13 of 2025-261,72489.1%2.2%
Period 12 of 2025-261,53788.0%1.6%
Period 11 of 2025-261,53386.9%1.7%
Period 10 of 2025-261,41386.0%1.8%
Period 9 of 2025-261,50373.9%2.1%
Period 8 of 2025-261,56375.3%3.8%

Time of year

60%70%80%90%P1: 87.8%1P2: 87.8%2P3: 85.2%3P4: 85.3%4P5: 86.6%5P6: 84.7%6P7: 83.3%7P8: 74.4%8P9: 66.0%9P10: 76.8%10P11: 84.5%11P12: 85.5%12P13: 87.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Bedhampton19,83377.9%3.1%
Robertsbridge19,76177.3%1.8%
Etchingham19,74576.8%1.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out