Etchingham
ETCSouth EastManaged by Southeastern
How this station is performing
Etchingham had 19,745 scheduled stops to Period 7 of 2026-27, about 54 a day. 76.8% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Etchingham opened on 1 September 1851, 175 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Etchingham is the oldest; the next oldest, Robertsbridge, dates from 1851.
The nearest stations to Etchingham are Robertsbridge (3.3 km south-east), Stonegate (5.6 km west), Wadhurst (11.4 km north-west), Battle (11.4 km south) and Crowhurst (14.2 km south). 2 stations lie within 10 km in all. Of the five, Robertsbridge is the most punctual at 77.3% and Stonegate the least at 70.9%, with Etchingham on 76.8%.
Etchingham takes its name from a Village called Etchingham, home to about 857 people, and the station stands 1.5 km from its centre.
For Etchingham, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 58.3% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2024-25, at 86.5%, which is 28.2 percentage points higher. Cancellations peaked at 7.4% of scheduled stops in Period 10 of 2023-24, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Etchingham is the least punctual, at 76.8%. All of them are ahead, including Robertsbridge (77.3%), Bedhampton (77.9%) and Longcross (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 19,745 | 76.8% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Etchingham? Delay Repay
These operators call at Etchingham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,534 | 63.2% | 2.0% |
| Period 6 of 2026-27 | 1,507 | 58.3% | 1.7% |
| Period 5 of 2026-27 | 1,572 | 75.5% | 2.2% |
| Period 4 of 2026-27 | 1,530 | 81.9% | 0.3% |
| Period 3 of 2026-27 | 1,495 | 80.8% | 2.3% |
| Period 2 of 2026-27 | 1,526 | 80.5% | 2.6% |
| Period 1 of 2026-27 | 1,717 | 84.9% | 0.7% |
| Period 13 of 2025-26 | 1,782 | 82.4% | 0.7% |
| Period 12 of 2025-26 | 1,568 | 83.9% | 1.1% |
| Period 11 of 2025-26 | 1,502 | 81.1% | 2.7% |
| Period 10 of 2025-26 | 1,302 | 76.5% | 3.0% |
| Period 9 of 2025-26 | 1,537 | 70.9% | 2.6% |
| Period 8 of 2025-26 | 1,173 | 75.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Robertsbridge | 19,761 | 77.3% | 1.8% |
| Bedhampton | 19,833 | 77.9% | 3.1% |
| Longcross | 19,942 | 86.1% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out