GTR at Battersea Park
How this operator is doing here
GTR had 78,348 scheduled stops at Battersea Park in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 94.1% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
GTR trains at Battersea Park also serve London Victoria (1.9 km north, 83.0% on time, 3.1% cancelled), Clapham Junction (2.2 km south-west, 84.2% on time, 2.8% cancelled), Imperial Wharf (2.5 km west, 89.6% on time, 4.0% cancelled), Loughborough Junction (3.4 km east, 82.9% on time, 8.3% cancelled), West Brompton (3.5 km west, 89.5% on time, 4.1% cancelled) and Wandsworth Common (3.7 km south, 93.0% on time, 2.8% cancelled), which are the stations on its network closest to Battersea Park.
Within 30 km of here, GTR runs best at Birkbeck, 10.4 km south-east (98.1%), and worst at Kenley, 17.3 km south (66.9%).
The busiest GTR station within 30 km of Battersea Park is East Croydon, 11.9 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Battersea Park, GTR is the least punctual, at 94.1%.
For GTR, Battersea Park is the 9th best of 307 ranked stations. Its 94.1% here is 11.2 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,981 | 92.7% | 5.8% |
| Period 6 of 2026-27 | 6,033 | 93.9% | 1.1% |
| Period 5 of 2026-27 | 5,971 | 92.0% | 3.9% |
| Period 4 of 2026-27 | 6,084 | 94.8% | 2.4% |
| Period 3 of 2026-27 | 6,023 | 93.7% | 2.3% |
| Period 2 of 2026-27 | 5,845 | 94.3% | 2.0% |
| Period 1 of 2026-27 | 6,426 | 95.7% | 1.7% |
| Period 13 of 2025-26 | 6,727 | 94.0% | 3.0% |
| Period 12 of 2025-26 | 5,911 | 95.3% | 3.3% |
| Period 11 of 2025-26 | 5,962 | 93.5% | 2.4% |
| Period 10 of 2025-26 | 5,372 | 94.6% | 2.1% |
| Period 9 of 2025-26 | 6,117 | 94.5% | 1.6% |
| Period 8 of 2025-26 | 5,896 | 94.7% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Battersea Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 2,359 | 94.3% | 5.6% |
| Southeastern | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out