Great Western Railway at Banbury
All trains at BanburyGreat Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 7,806 scheduled stops at Banbury in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 74.6% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Great Western Railway trains at Banbury also serve Kings Sutton (5.5 km south-east, 76.5% on time, 2.2% cancelled), Heyford (15.9 km south, 75.5% on time, 2.2% cancelled), Tackley (20.1 km south, 75.8% on time, 2.2% cancelled), Charlbury (23.7 km south-west, 60.9% on time, 4.4% cancelled), Finstock (25.1 km south-west, – on time, – cancelled) and Combe (Oxon) (25.8 km south, – on time, – cancelled), which are the stations on its network closest to Banbury.
Within 30 km of here, Great Western Railway runs best at Kings Sutton, 5.5 km south-east (76.5%), and worst at Moreton-in-Marsh, 26.6 km west (56.4%).
The busiest Great Western Railway station within 30 km of Banbury is Moreton-in-Marsh, 26.6 km west, with about 40 scheduled stops a day.
Great Western Railway at Banbury has slipped sharply. 74.6% of stops came within three minutes of the timetable in the latest 13 periods, 6.4 percentage points worse than the 81.0% recorded in the 13 before. Cancellations held steady at 2.8% of scheduled stops, against 2.6% before.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 592 | 70.8% | 3.9% |
| Period 6 of 2026-27 | 616 | 71.5% | 3.2% |
| Period 5 of 2026-27 | 608 | 65.6% | 5.4% |
| Period 4 of 2026-27 | 602 | 65.4% | 2.0% |
| Period 3 of 2026-27 | 614 | 72.9% | 5.0% |
| Period 2 of 2026-27 | 596 | 73.9% | 1.7% |
| Period 1 of 2026-27 | 688 | 80.4% | 2.2% |
| Period 13 of 2025-26 | 644 | 84.1% | 1.2% |
| Period 12 of 2025-26 | 574 | 80.1% | 4.5% |
| Period 11 of 2025-26 | 592 | 80.9% | 1.7% |
| Period 10 of 2025-26 | 514 | 81.0% | 1.6% |
| Period 9 of 2025-26 | 592 | 68.5% | 1.4% |
| Period 8 of 2025-26 | 574 | 73.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Banbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 25,050 | 80.0% | 0.9% |
| CrossCountry | 16,302 | 53.1% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out