Southwick
SWKSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Southwick had 48,345 scheduled stops to Period 7 of 2026-27, about 133 a day. 81.4% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Southwick opened on 12 May 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Southwick is the oldest; the next oldest, Portslade, dates from 1840.
The nearest stations to Southwick are Fishersgate (1.3 km east), Portslade (2.3 km east), Shoreham-by-Sea (2.4 km west), Aldrington (3.9 km east) and Hove (4.7 km east). 12 stations lie within 10 km in all. Of the five, Fishersgate is the most punctual at 84.7% and Shoreham-by-Sea the least at 78.5%, with Southwick on 81.4%.
Southwick is one of 5 stations named after a town called Southwick, home to about 13,195 people; this one stands 0.4 km from its centre.
Southwick has slipped a little, from 84.9% within three minutes in the previous 13 periods to 81.4% in the latest 13, a fall of 3.5 percentage points. Cancellations rose to 4.6% of scheduled stops from 3.4%, which is 1.2 percentage points more.
1 of 3 stations of a similar size in South East are more punctual than Southwick on 81.4%. The comparison group includes Ash Vale (91.2%), Emsworth (76.7%) and Crawley (71.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 48,345 | 81.4% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Southwick? Delay Repay
These operators call at Southwick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,664 | 74.8% | 6.0% |
| Period 6 of 2026-27 | 3,751 | 76.8% | 4.4% |
| Period 5 of 2026-27 | 3,733 | 76.1% | 4.4% |
| Period 4 of 2026-27 | 3,737 | 81.5% | 3.6% |
| Period 3 of 2026-27 | 3,604 | 79.8% | 4.8% |
| Period 2 of 2026-27 | 3,674 | 81.8% | 8.2% |
| Period 1 of 2026-27 | 4,238 | 84.5% | 4.6% |
| Period 13 of 2025-26 | 3,930 | 86.6% | 4.9% |
| Period 12 of 2025-26 | 3,781 | 85.4% | 3.5% |
| Period 11 of 2025-26 | 3,717 | 85.7% | 4.0% |
| Period 10 of 2025-26 | 3,314 | 83.3% | 3.1% |
| Period 9 of 2025-26 | 3,642 | 78.1% | 4.8% |
| Period 8 of 2025-26 | 3,560 | 82.4% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out