CrossCountry at Banbury
How this operator is doing here
CrossCountry had 16,302 scheduled stops at Banbury in the 13 periods to Period 7 of 2026-27, 33% of the station's total. 53.1% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
CrossCountry trains at Banbury also serve Leamington Spa (28.6 km north-west, 56.8% on time, 5.1% cancelled), Oxford (34.4 km south, 59.0% on time, 5.4% cancelled), Coventry (39.9 km north, 54.6% on time, 4.8% cancelled), Dorridge (45.1 km north-west, – on time, – cancelled), Didcot Parkway (50.3 km south, 89.7% on time, 3.4% cancelled) and Birmingham International (51.1 km north-west, 52.1% on time, 4.8% cancelled), which are the stations on its network closest to Banbury.
The busiest CrossCountry station within 30 km of Banbury is Leamington Spa, 28.6 km north-west, with about 46 scheduled stops a day.
Of the 3 operators with enough records at Banbury, CrossCountry is the least punctual, at 53.1%.
For CrossCountry, Banbury is the 96th best of 99 ranked stations. Its 53.1% here is 10.1 percentage points below the 63.2% across the whole network.
CrossCountry at Banbury has slipped sharply. 53.1% of stops came within three minutes of the timetable in the latest 13 periods, 9.0 percentage points worse than the 62.1% recorded in the 13 before. Cancellations rose to 5.0% of scheduled stops from 4.3%, which is 0.7 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,290 | 46.2% | 4.7% |
| Period 6 of 2026-27 | 1,307 | 39.0% | 7.1% |
| Period 5 of 2026-27 | 1,286 | 39.5% | 5.3% |
| Period 4 of 2026-27 | 1,283 | 40.0% | 5.9% |
| Period 3 of 2026-27 | 1,227 | 54.0% | 4.5% |
| Period 2 of 2026-27 | 1,258 | 55.9% | 7.5% |
| Period 1 of 2026-27 | 1,460 | 62.6% | 2.5% |
| Period 13 of 2025-26 | 1,378 | 65.9% | 2.8% |
| Period 12 of 2025-26 | 1,182 | 70.8% | 5.1% |
| Period 11 of 2025-26 | 1,271 | 63.5% | 4.2% |
| Period 10 of 2025-26 | 1,099 | 57.8% | 8.2% |
| Period 9 of 2025-26 | 1,147 | 44.0% | 4.5% |
| Period 8 of 2025-26 | 1,114 | 49.7% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Banbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 25,050 | 80.0% | 0.9% |
| Great Western Railway | 7,806 | 74.6% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out