Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Aylesbury Vale Parkway

AVPSouth EastManaged by Chiltern Railways

On time, last 13 periods91.0%Great Britain: 83.6%
Cancelled2.0%Great Britain: 3.2%
Stops a day39Scheduled, on average
Punctuality rank441st of 2,374Among ranked stations

How this station is performing

Aylesbury Vale Parkway had 14,290 scheduled stops to Period 7 of 2026-27, about 39 a day. 91.0% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.

Aylesbury Vale Parkway opened on 14 December 2008, 18 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Aylesbury Vale Parkway is the newest; the oldest, Aylesbury, opened in 1863.

The nearest stations to Aylesbury Vale Parkway are Aylesbury (3.7 km south-east), Stoke Mandeville (7.1 km south-east), Haddenham and Thame Parkway (8.8 km south-west), Little Kimble (9.5 km south) and Monks Risborough (10.8 km south). 4 stations lie within 10 km in all. Of the five, Little Kimble is the most punctual at 94.5% and Haddenham and Thame Parkway the least at 85.2%, with Aylesbury Vale Parkway on 91.0%.

Aylesbury Vale Parkway is a parkway station, 3.6 km from the centre of Aylesbury, a county town, home to about 83,407 people, which gives it its name.

Compared with 3 stations of a similar size in South East, Aylesbury Vale Parkway is the most punctual, at 91.0%. The comparison group includes Newbury Racecourse (77.9%), Aldermaston (79.5%) and Kingham (56.7%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 92.0%Period 2 of 2023-24: 91.3%Period 3 of 2023-24: 91.9%Period 4 of 2023-24: 94.1%Period 5 of 2023-24: 93.1%Period 6 of 2023-24: 94.2%Period 7 of 2023-24: 87.6%Period 8 of 2023-24: 88.2%Period 9 of 2023-24: 82.4%Period 10 of 2023-24: 89.8%Period 11 of 2023-24: 91.6%Period 12 of 2023-24: 87.5%Period 13 of 2023-24: 92.5%Period 1 of 2024-25: 93.0%Period 2 of 2024-25: 93.1%Period 3 of 2024-25: 92.8%Period 4 of 2024-25: 89.9%Period 5 of 2024-25: 85.3%Period 6 of 2024-25: 90.5%Period 7 of 2024-25: 84.0%Period 8 of 2024-25: 88.5%Period 9 of 2024-25: 83.3%Period 10 of 2024-25: 90.6%Period 11 of 2024-25: 92.8%Period 12 of 2024-25: 95.5%Period 13 of 2024-25: 95.8%Period 1 of 2025-26: 95.0%Period 2 of 2025-26: 91.6%Period 3 of 2025-26: 90.8%Period 4 of 2025-26: 89.5%Period 5 of 2025-26: 93.2%Period 6 of 2025-26: 94.0%Period 7 of 2025-26: 89.4%Period 8 of 2025-26: 86.2%Period 9 of 2025-26: 85.3%Period 10 of 2025-26: 90.1%Period 11 of 2025-26: 91.3%Period 12 of 2025-26: 94.9%Period 13 of 2025-26: 94.7%Period 1 of 2026-27: 93.9%Period 2 of 2026-27: 90.9%Period 3 of 2026-27: 90.5%Period 4 of 2026-27: 89.5%Period 5 of 2026-27: 91.6%Period 6 of 2026-27: 91.9%Period 7 of 2026-27: 92.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 2.3%Period 2 of 2023-24: 1.8%Period 3 of 2023-24: 0.6%Period 4 of 2023-24: 0.3%Period 5 of 2023-24: 1.8%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 4.8%Period 8 of 2023-24: 1.7%Period 9 of 2023-24: 1.6%Period 10 of 2023-24: 3.2%Period 11 of 2023-24: 3.3%Period 12 of 2023-24: 3.2%Period 13 of 2023-24: 2.6%Period 1 of 2024-25: 1.0%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 1.8%Period 4 of 2024-25: 2.6%Period 5 of 2024-25: 3.2%Period 6 of 2024-25: 1.8%Period 7 of 2024-25: 4.0%Period 8 of 2024-25: 4.4%Period 9 of 2024-25: 5.2%Period 10 of 2024-25: 3.4%Period 11 of 2024-25: 2.3%Period 12 of 2024-25: 1.2%Period 13 of 2024-25: 4.8%Period 1 of 2025-26: 1.2%Period 2 of 2025-26: 1.5%Period 3 of 2025-26: 1.5%Period 4 of 2025-26: 3.7%Period 5 of 2025-26: 3.4%Period 6 of 2025-26: 2.4%Period 7 of 2025-26: 4.3%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 1.4%Period 10 of 2025-26: 1.0%Period 11 of 2025-26: 1.6%Period 12 of 2025-26: 0.9%Period 13 of 2025-26: 1.4%Period 1 of 2026-27: 0.5%Period 2 of 2026-27: 3.1%Period 3 of 2026-27: 5.7%Period 4 of 2026-27: 1.8%Period 5 of 2026-27: 1.5%Period 6 of 2026-27: 2.4%Period 7 of 2026-27: 2.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways14,29091.0%2.0%

Operators with their own page for this station are linked to it.

Late train at Aylesbury Vale Parkway? Delay Repay

These operators call at Aylesbury Vale Parkway and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,12392.1%2.5%
Period 6 of 2026-271,20791.9%2.4%
Period 5 of 2026-271,14491.6%1.5%
Period 4 of 2026-271,13289.5%1.8%
Period 3 of 2026-2797190.5%5.7%
Period 2 of 2026-271,04490.9%3.1%
Period 1 of 2026-271,09193.9%0.5%
Period 13 of 2025-261,29394.7%1.4%
Period 12 of 2025-261,03794.9%0.9%
Period 11 of 2025-261,12691.3%1.6%
Period 10 of 2025-2689690.1%1.0%
Period 9 of 2025-261,19085.3%1.4%
Period 8 of 2025-261,03686.2%2.5%

Time of year

80%90%100%P1: 93.4%1P2: 91.7%2P3: 91.5%3P4: 90.7%4P5: 90.3%5P6: 92.5%6P7: 88.5%7P8: 87.7%8P9: 83.7%9P10: 90.1%10P11: 91.9%11P12: 92.7%12P13: 94.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Newbury Racecourse14,28477.9%1.7%
Aldermaston14,21579.5%1.7%
Kingham14,42556.7%4.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out