How this station is performing
Aldermaston had 14,215 scheduled stops to Period 7 of 2026-27, about 39 a day. 79.5% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Aldermaston opened on 21 December 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Aldermaston is the oldest; the next oldest, Midgham, dates from 1847.
The nearest stations to Aldermaston are Midgham (2.9 km west), Theale (5.5 km north-east), Thatcham (7.4 km west), Mortimer (7.8 km south-east) and Bramley (Hampshire) (9.6 km south-east). 7 stations lie within 10 km in all. Of the five, Bramley (Hampshire) is the most punctual at 86.5% and Thatcham the least at 77.8%, with Aldermaston on 79.5%.
Aldermaston takes its name from a Village called Aldermaston, home to about 1,112 people, and the station stands 2.3 km from its centre.
Across the whole run of data, the weakest four-week period for Aldermaston was Period 5 of 2023-24, at 70.1%, some time before the latest year. The strongest was Period 2 of 2025-26, at 86.1%, and the two are 16.0 percentage points apart. Cancellations peaked at 11.8% of scheduled stops in Period 10 of 2023-24, against 1.7% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Aldermaston on 79.5%. The comparison group includes Saunderton (89.2%), Newbury Racecourse (77.9%) and Aylesbury Vale Parkway (91.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,215 | 79.5% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Aldermaston? Delay Repay
These operators call at Aldermaston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,094 | 80.3% | 2.3% |
| Period 6 of 2026-27 | 1,084 | 75.4% | 1.1% |
| Period 5 of 2026-27 | 1,089 | 77.6% | 1.8% |
| Period 4 of 2026-27 | 1,103 | 72.2% | 1.5% |
| Period 3 of 2026-27 | 970 | 79.3% | 2.0% |
| Period 2 of 2026-27 | 1,068 | 82.3% | 2.3% |
| Period 1 of 2026-27 | 1,263 | 82.6% | 1.9% |
| Period 13 of 2025-26 | 1,201 | 85.4% | 1.2% |
| Period 12 of 2025-26 | 1,087 | 84.9% | 1.3% |
| Period 11 of 2025-26 | 1,088 | 82.2% | 1.5% |
| Period 10 of 2025-26 | 996 | 82.4% | 2.3% |
| Period 9 of 2025-26 | 1,087 | 73.5% | 0.9% |
| Period 8 of 2025-26 | 1,085 | 74.3% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saunderton | 14,155 | 89.2% | 1.3% |
| Newbury Racecourse | 14,284 | 77.9% | 1.7% |
| Aylesbury Vale Parkway | 14,290 | 91.0% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out