Lidlington
LIDEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Lidlington had 10,297 scheduled stops to Period 7 of 2026-27, about 28 a day. 93.9% of recorded arrivals were within three minutes of the timetable and 7.5% of scheduled stops were cancelled.
Lidlington opened on 18 November 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Lidlington is the oldest; the next oldest, Millbrook (Bedfordshire), dates from 1846.
The nearest stations to Lidlington are Millbrook (Bedfordshire) (2.3 km north-east), Ridgmont (3.0 km south-west), Stewartby (4.0 km north-east), Aspley Guise (5.5 km south-west) and Flitwick (6.1 km south-east). 8 stations lie within 10 km in all. At 93.9%, Lidlington is more punctual than every one of them; the best of the five, Aspley Guise, manages 93.7%.
Lidlington takes its name from a Village called Lidlington, home to about 1,477 people, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Lidlington was Period 11 of 2023-24, at 68.9%, some time before the latest year. The strongest was Period 1 of 2026-27, at 96.0%, and the two are 27.1 percentage points apart. Cancellations peaked at 18.8% of scheduled stops in Period 5 of 2026-27, against 7.5% over the latest 13 periods.
Compared with 3 stations of a similar size in East of England, Lidlington is the most punctual, at 93.9%. The comparison group includes Bedford St Johns (89.5%), Kempston Hardwick (93.2%) and Stewartby (92.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 10,297 | 93.9% | 7.5% |
Operators with their own page for this station are linked to it.
Late train at Lidlington? Delay Repay
These operators call at Lidlington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 94.0% | 3.4% |
| Period 6 of 2026-27 | 757 | 94.4% | 17.3% |
| Period 5 of 2026-27 | 690 | 92.7% | 18.8% |
| Period 4 of 2026-27 | 708 | 95.3% | 9.6% |
| Period 3 of 2026-27 | 816 | 92.9% | 8.8% |
| Period 2 of 2026-27 | 748 | 93.8% | 5.6% |
| Period 1 of 2026-27 | 918 | 96.0% | 10.0% |
| Period 13 of 2025-26 | 884 | 94.2% | 4.3% |
| Period 12 of 2025-26 | 816 | 95.1% | 3.1% |
| Period 11 of 2025-26 | 816 | 91.7% | 3.8% |
| Period 10 of 2025-26 | 696 | 93.9% | 3.9% |
| Period 9 of 2025-26 | 816 | 93.8% | 5.1% |
| Period 8 of 2025-26 | 816 | 92.3% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bedford St Johns | 10,297 | 89.5% | 7.5% |
| Kempston Hardwick | 10,297 | 93.2% | 7.5% |
| Stewartby | 10,297 | 92.5% | 7.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out