Kempston Hardwick
KMHEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Kempston Hardwick had 10,297 scheduled stops to Period 7 of 2026-27, about 28 a day. 93.2% of recorded arrivals were within three minutes of the timetable and 7.5% of scheduled stops were cancelled.
Kempston Hardwick opened on 4 November 1905, 121 years before the latest figures here, and has not been moved since. The First World War closed Kempston Hardwick on 1 January 1917, and it reopened on 5 May 1919. Of the 5 stations nearest to it with a known opening date, Kempston Hardwick is the newest; the oldest, Millbrook (Bedfordshire), opened in 1846.
The nearest stations to Kempston Hardwick are Stewartby (2.8 km south-west), Millbrook (Bedfordshire) (4.6 km south-west), Bedford St Johns (4.8 km north-east), Bedford (5.2 km north) and Lidlington (6.8 km south-west). 7 stations lie within 10 km in all. Of the five, Lidlington is the most punctual at 93.9% and Bedford the least at 83.4%, with Kempston Hardwick on 93.2%.
Kempston Hardwick takes its name from a Village called Kempston Hardwick, and the station stands 0.7 km from its centre.
1 of 3 stations of a similar size in East of England are more punctual than Kempston Hardwick on 93.2%. The comparison group includes Bedford St Johns (89.5%), Lidlington (93.9%) and Stewartby (92.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 10,297 | 93.2% | 7.5% |
Operators with their own page for this station are linked to it.
Late train at Kempston Hardwick? Delay Repay
These operators call at Kempston Hardwick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 93.1% | 3.4% |
| Period 6 of 2026-27 | 757 | 93.0% | 17.3% |
| Period 5 of 2026-27 | 690 | 92.9% | 18.8% |
| Period 4 of 2026-27 | 708 | 95.0% | 9.5% |
| Period 3 of 2026-27 | 816 | 93.0% | 8.7% |
| Period 2 of 2026-27 | 748 | 93.2% | 5.6% |
| Period 1 of 2026-27 | 918 | 94.7% | 9.9% |
| Period 13 of 2025-26 | 884 | 92.8% | 4.4% |
| Period 12 of 2025-26 | 816 | 94.5% | 3.2% |
| Period 11 of 2025-26 | 816 | 90.7% | 3.9% |
| Period 10 of 2025-26 | 696 | 92.2% | 3.9% |
| Period 9 of 2025-26 | 816 | 94.0% | 5.1% |
| Period 8 of 2025-26 | 816 | 92.8% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bedford St Johns | 10,297 | 89.5% | 7.5% |
| Lidlington | 10,297 | 93.9% | 7.5% |
| Stewartby | 10,297 | 92.5% | 7.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out