ScotRail at Ardlui
How this operator is doing here
ScotRail had 4,388 scheduled stops at Ardlui in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 60.9% of recorded arrivals came within three minutes and 0.8% of stops were cancelled.
ScotRail trains at Ardlui also serve Arrochar and Tarbet (11.0 km south, 55.7% on time, 0.8% cancelled), Crianlarich (11.7 km north-east, 60.4% on time, 0.9% cancelled), Tyndrum Lower (14.6 km north, 63.4% on time, 1.1% cancelled), Upper Tyndrum (14.8 km north, 68.4% on time, 0.6% cancelled), Dalmally (19.5 km north-west, 78.2% on time, 1.4% cancelled) and Loch Awe (22.6 km north-west, 77.8% on time, 1.4% cancelled), which are the stations on its network closest to Ardlui.
Within 30 km of here, ScotRail runs best at Dalmally, 19.5 km north-west (78.2%), and worst at Arrochar and Tarbet, 11.0 km south (55.7%).
The busiest ScotRail station within 30 km of Ardlui is Crianlarich, 11.7 km north-east, with about 17 scheduled stops a day.
Of the 1 operators with enough records at Ardlui, ScotRail is the most punctual, at 60.9%.
For ScotRail, Ardlui is the 305th best of 312 ranked stations. Its 60.9% here is 27.0 percentage points below the 87.9% across the whole network.
ScotRail cancels fewer trains at Ardlui than elsewhere: 0.8% of scheduled stops, against 1.6% across its network and 0.9% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 341 | 52.5% | 0.0% |
| Period 6 of 2026-27 | 344 | 62.9% | 1.5% |
| Period 5 of 2026-27 | 344 | 63.4% | 0.3% |
| Period 4 of 2026-27 | 342 | 54.0% | 0.6% |
| Period 3 of 2026-27 | 344 | 55.7% | 1.2% |
| Period 2 of 2026-27 | 344 | 57.8% | 0.0% |
| Period 1 of 2026-27 | 394 | 65.3% | 0.3% |
| Period 13 of 2025-26 | 376 | 62.9% | 1.1% |
| Period 12 of 2025-26 | 336 | 69.1% | 0.3% |
| Period 11 of 2025-26 | 333 | 64.4% | 2.1% |
| Period 10 of 2025-26 | 230 | 67.2% | 0.4% |
| Period 9 of 2025-26 | 326 | 57.6% | 2.1% |
| Period 8 of 2025-26 | 334 | 60.0% | 0.9% |
Other operators at Ardlui
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 281 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out